Town of Plantersville
This Project consists of: 1,150 tons of stone riprap (200 lbs) lagoon levee stabilization, 701 LF of 10" gravity sewer line, 1,237 LF of 8" gravity sewer line, 13 manholes, 600 LF of 4" service line, service connections, open-cut and bored steel encasements, bituminous resurfacing, and any additional miscellaneous appurtenances.
Town of Plantersville
Sewer system improvements. Work consists of: 1,150 tons of stone riprap (200 lbs) lagoon levee stabilization, 701' of 10" gravity sewer line, 1,237' of 8" gravity sewer line, 13 manholes, 600' of 4" service line, service connections, open-cut and bored steel encasements, bituminous resurfacing, and any additional miscellaneous appurtenances.
Town of Coahoma
Installation of clearing of existing swales and ditches, new generator and chainlink fence.
Charter Township of Fenton
Provide maintenance of its sanitary sewer system. The contractor shall operate and maintain the townships' sanitary sewer system, including pump stations, manholes and sewer lines employing qualified personnel and utilizing the vehicles and equipment necessary to maintain the system in good working order.
Release
Sep 29, 2025
Close
Oct 30, 2025