Retrieving RFP details
Release
Close
City of Edgewater
Work consist of approx. 7,880 LF of 8" sanitary sewer, approx. 300 vertical feet and lining of approx. 360 LF of 6" sanitary sewer, bypassing shall be included to maintain sewer service to all residents. Installation of sewer lining and manhole lining shall maintain in-situ conditions.
Rehabilitation of Sanitary Sewer Lines and Manholes (CDBG 23DB-N33)
zip
City of Sarasota
Rehabilitation and/or renewal of sanitary sewer manholes on an "as needed" basis.
Newport Mud
Provide sanitary sewer phase 8 manhole rehabilitation. In general, this work consists of: cleaning and preparing of sanitary sewer manholes prior to rehabilitation, including removing existing liners, debris, etc; repair of sanitary sewer manholes including cementitious lining, epoxy lining, removing and replacing frames and covers, raising sanitary sewer manholes, repair of bench and invert, and grouting exterior of manhole frames; bypass pumping, as directed by engineer, to properly rehabilitate any manholes where a flow through bridge or plug is not a viable option. The cost for flow through bridges or plugs shall be included in other work items. See outside link.
Rolling Creek Utility District
Sanitary Sewer Rehabilitation.
Release
Oct 22, 2025
Close
Dec 03, 2025