Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Copiah County
Sewer system improvements.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Itta Bena
Work includes sewer system improvements.
Posted Date
Oct 29, 2025
Due Date
Dec 3, 2025
Release: Oct 29, 2025
City of Itta Bena
Close: Dec 3, 2025
Work includes sewer system improvements.
AvailableAlaska Area Native Health Service
The project includes Phase 1 - Lift Station work, and the first 10 LF of the force main: Rehabilitate existing lift station wet well and Appurtenances. See sheet C-106, Rehabilitate existing lift station building wall paneling, weather stripping, and electrical. See architectural, structural, mechanical, and electrical sheets, Construct addition to lift station for new valve vault. See structural & architectural sheets, Install new wet well pumps, monitoring system, electrical instrumentation, and appurtenances, Construct new arctic pipe force main with force main cleanouts, abandon existing force main in place. Phase 2 - Construction of the septic system, force main, and abandoning of the existing septic system and force main: Construct new community septic tanks and mounded drainage fields, Replace existing sewer collection system components including manholes, main, service connections, Abandon existing community septic tanks and drainfield. Phase 3 - Additive Alternate: Sewer Main and Manhole Repairs: Flush gravity mains to remove all debris. Inspect gravity sewer mains and manholes specified herein, Install new manhole liners, dust pans, and repair cracking and spalling.
Posted Date
Dec 12, 2023
Due Date
Nov 20, 2025
Release: Dec 12, 2023
Alaska Area Native Health Service
Close: Nov 20, 2025
The project includes Phase 1 - Lift Station work, and the first 10 LF of the force main: Rehabilitate existing lift station wet well and Appurtenances. See sheet C-106, Rehabilitate existing lift station building wall paneling, weather stripping, and electrical. See architectural, structural, mechanical, and electrical sheets, Construct addition to lift station for new valve vault. See structural & architectural sheets, Install new wet well pumps, monitoring system, electrical instrumentation, and appurtenances, Construct new arctic pipe force main with force main cleanouts, abandon existing force main in place. Phase 2 - Construction of the septic system, force main, and abandoning of the existing septic system and force main: Construct new community septic tanks and mounded drainage fields, Replace existing sewer collection system components including manholes, main, service connections, Abandon existing community septic tanks and drainfield. Phase 3 - Additive Alternate: Sewer Main and Manhole Repairs: Flush gravity mains to remove all debris. Inspect gravity sewer mains and manholes specified herein, Install new manhole liners, dust pans, and repair cracking and spalling.
AvailableTown of Walpole
The Town of Walpole is soliciting bids for sewer system improvements under Contract 2026-07 (BD-25-1587) with a bid opening on Dec 2, 2025 at 10:00 AM local time. Solicitation documents are expected on COMMBUYS or the Town purchasing page, but no primary solicitation file was located on the Town page or the COMMBUYS pages retrieved.
Posted Date
-
Due Date
Dec 2, 2025
Town of Walpole
Close: Dec 2, 2025
The Town of Walpole is soliciting bids for sewer system improvements under Contract 2026-07 (BD-25-1587) with a bid opening on Dec 2, 2025 at 10:00 AM local time. Solicitation documents are expected on COMMBUYS or the Town purchasing page, but no primary solicitation file was located on the Town page or the COMMBUYS pages retrieved.
AvailableTown of Canadian
Remove and Replace 602 LF Sewer Main. Remove and replace 3 manholes.
Posted Date
Nov 15, 2025
Due Date
Dec 11, 2025
Release: Nov 15, 2025
Town of Canadian
Close: Dec 11, 2025
Remove and Replace 602 LF Sewer Main. Remove and replace 3 manholes.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis