Retrieving RFP details
Release
Close
Alaska Area Native Health Service
The project includes Phase 1 - Lift Station work, and the first 10 LF of the force main: Rehabilitate existing lift station wet well and Appurtenances. See sheet C-106, Rehabilitate existing lift station building wall paneling, weather stripping, and electrical. See architectural, structural, mechanical, and electrical sheets, Construct addition to lift station for new valve vault. See structural & architectural sheets, Install new wet well pumps, monitoring system, electrical instrumentation, and appurtenances, Construct new arctic pipe force main with force main cleanouts, abandon existing force main in place. Phase 2 - Construction of the septic system, force main, and abandoning of the existing septic system and force main: Construct new community septic tanks and mounded drainage fields, Replace existing sewer collection system components including manholes, main, service connections, Abandon existing community septic tanks and drainfield. Phase 3 - Additive Alternate: Sewer Main and Manhole Repairs: Flush gravity mains to remove all debris. Inspect gravity sewer mains and manholes specified herein, Install new manhole liners, dust pans, and repair cracking and spalling.
26-B-12419
zip
Town of Plantersville
Sewer system improvements. Work consists of: 1,150 tons of stone riprap (200 lbs) lagoon levee stabilization, 701' of 10" gravity sewer line, 1,237' of 8" gravity sewer line, 13 manholes, 600' of 4" service line, service connections, open-cut and bored steel encasements, bituminous resurfacing, and any additional miscellaneous appurtenances.
City of Shaw
Construction of sewer system improvements. The project consists of the following approximate items/quantities: 1,200 feet of 8" 12" gravity sewer line replacement; 13-48" manhole replacement; gravity sewer line point repairs; post treatment aeration; flow monitoring equipment; lagoon levee rip rap stabilization; miscellaneous electrical work; miscellaneous resurfacing & appurtenances.
Town of Whitakers
Construction of 2019 sanitary sewer improvements. Contract no. 3 - sewer collection system rehabilitation.
Release
Dec 12, 2023
Close
Nov 20, 2025