Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Closure of the seckman lagoon.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This Request for Proposals (RFP) is for the Lagoon House Shoreline Preservation/Mitigation project. It was published on November 17, 2025, and proposals are due by December 16, 2025. The project aims to address shoreline preservation and mitigation efforts.
Posted Date
Nov 17, 2025
Due Date
Dec 16, 2025
Release: Nov 17, 2025
Close: Dec 16, 2025
This Request for Proposals (RFP) is for the Lagoon House Shoreline Preservation/Mitigation project. It was published on November 17, 2025, and proposals are due by December 16, 2025. The project aims to address shoreline preservation and mitigation efforts.
AvailablePremium
Access the largest public sector contact database
Remove and replace 3,600' of lagoon fencing including two gates. Remove and replace the wastewater treatment plant swing gate with an automatic slide gate.
Posted Date
Nov 10, 2025
Due Date
Dec 16, 2025
Release: Nov 10, 2025
Close: Dec 16, 2025
Remove and replace 3,600' of lagoon fencing including two gates. Remove and replace the wastewater treatment plant swing gate with an automatic slide gate.
AvailableProvide lagoon aeration. Furnish and install 480V, 3 PH, 30A feeder from existing panelboard to proposed aeration equipment disconnect. See outside link.
Posted Date
Nov 6, 2024
Due Date
Nov 19, 2028
Release: Nov 6, 2024
Close: Nov 19, 2028
Provide lagoon aeration. Furnish and install 480V, 3 PH, 30A feeder from existing panelboard to proposed aeration equipment disconnect. See outside link.
AvailableThe County of San Luis Obispo seeks a professional engineering consultant to manage and support post-closure maintenance and corrective actions at the Los Osos Closed Landfill. Scope includes oversight of operations, monitoring and maintenance contractors; monitoring of remediation systems (monitoring well network, cap and drainage, gas collection and flare, and groundwater extraction and treatment); regulatory and technical guidance; and engineering/design services to reduce long-term costs and maintain compliance with Title 27, WDR, MRP, NPDES, and CAO requirements. The consultant will provide project management, regular coordination with County staff and regulators, and planning/design to support ongoing post-closure compliance.
Posted Date
Dec 9, 2025
Due Date
Jan 14, 2026
Release: Dec 9, 2025
Close: Jan 14, 2026
The County of San Luis Obispo seeks a professional engineering consultant to manage and support post-closure maintenance and corrective actions at the Los Osos Closed Landfill. Scope includes oversight of operations, monitoring and maintenance contractors; monitoring of remediation systems (monitoring well network, cap and drainage, gas collection and flare, and groundwater extraction and treatment); regulatory and technical guidance; and engineering/design services to reduce long-term costs and maintain compliance with Title 27, WDR, MRP, NPDES, and CAO requirements. The consultant will provide project management, regular coordination with County staff and regulators, and planning/design to support ongoing post-closure compliance.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis