Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes removal of the existing roofing and replacement with new asphalt shingles, repair or addition of roof sheathing and/or nail base, partial demolition of a masonry chimney, new fascia and vented and unvented soffit panels, new siding and trim, replacement of exterior patio door, demo of existing gas water heater and replacement with electric water heater, demo of wood deck and replacement with concrete patio, framing to strengthen car port roof, rerouting of gas furnace intake and vent.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replacing the existing woodshop dust collection system in entirety with a new system to serve all the woodshop equipment throughout the shop. The new dust collection system shall be fitted with Code required dust collection devices inclusive of fire suppression, spark detection, and explosion isolation devices. The dust collection system shall be a pulse type cartridge collector. Dust collection system shall utilize standalone controls; there is no desired interconnection to the existing facility building management system for the new dust collector. All the woodshop equipment shall be removed from the shop and relocated back in by the awarded contractor and connected to the associated utilities. The existing heating and ventilating systems serving the woodshop will be removed. New heating and ventilation strategies will be implemented into the shop. The existing general exhaust systems within the woodshop and supporting finishing spaces will be upgraded. The existing electrical system serving the woodshop equipment and the new dust collector system and equipment will be modified as part of the project. Existing electrical bus ducts are present in the woodshop will be replaced with new. The woodshop and all associated support spaces are to be fitted with new LED lights. The woodshop’s existing walls shall be cleaned and painted. Project shall include replacement of existing fire sprinkler heads as needed to provide appropriate coverage with the new dust collection system layouts. Existing plumbing systems present in the woodshop and support spaces are to remain in place. A new compressed air plant will be included in this project.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Premium
Access the largest public sector contact database
Release: Dec 9, 2025
Close: Jan 6, 2026
Replacing the existing woodshop dust collection system in entirety with a new system to serve all the woodshop equipment throughout the shop. The new dust collection system shall be fitted with Code required dust collection devices inclusive of fire suppression, spark detection, and explosion isolation devices. The dust collection system shall be a pulse type cartridge collector. Dust collection system shall utilize standalone controls; there is no desired interconnection to the existing facility building management system for the new dust collector. All the woodshop equipment shall be removed from the shop and relocated back in by the awarded contractor and connected to the associated utilities. The existing heating and ventilating systems serving the woodshop will be removed. New heating and ventilation strategies will be implemented into the shop. The existing general exhaust systems within the woodshop and supporting finishing spaces will be upgraded. The existing electrical system serving the woodshop equipment and the new dust collector system and equipment will be modified as part of the project. Existing electrical bus ducts are present in the woodshop will be replaced with new. The woodshop and all associated support spaces are to be fitted with new LED lights. The woodshop’s existing walls shall be cleaned and painted. Project shall include replacement of existing fire sprinkler heads as needed to provide appropriate coverage with the new dust collection system layouts. Existing plumbing systems present in the woodshop and support spaces are to remain in place. A new compressed air plant will be included in this project.
AvailableDESIGN/BUILD: Replacing an existing fiber cement panel facade with a combination of prefabricated and field applied exterior insulation finish systems. The work also includes new cantilevered tapered parapet coping and the application of an elastomeric coating over existing portland cement wall finish and accent banding. The demolition includes the removal of existing fiber cement panels, air barrier (TYVEK), 2" and 3" thick foil faced rigid insulation, "Z" shaped furring and tapered parapet coping as required to expose the existing gypsum building sheathing and concrete masonry back up wall construction. The new EIFS systems will be adhered to the existing gypsum building sheathing and concrete masonry back up wall construction.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
DESIGN/BUILD: Replacing an existing fiber cement panel facade with a combination of prefabricated and field applied exterior insulation finish systems. The work also includes new cantilevered tapered parapet coping and the application of an elastomeric coating over existing portland cement wall finish and accent banding. The demolition includes the removal of existing fiber cement panels, air barrier (TYVEK), 2" and 3" thick foil faced rigid insulation, "Z" shaped furring and tapered parapet coping as required to expose the existing gypsum building sheathing and concrete masonry back up wall construction. The new EIFS systems will be adhered to the existing gypsum building sheathing and concrete masonry back up wall construction.
AvailableThe project consists of constructing one new duplex.
Posted Date
Nov 12, 2025
Due Date
Dec 12, 2025
Release: Nov 12, 2025
Close: Dec 12, 2025
The project consists of constructing one new duplex.
1 ea, duplex strainer, nps 4", bronze body, ANSI CL 150 flat face flanges, 20 perforated holes monel baskets; fluid filtration, NSN: 4730 01-LG2-1282, P/N: 0W6P2 / 72-48F-EQUIV.
Posted Date
Dec 11, 2025
Due Date
Dec 29, 2025
Release: Dec 11, 2025
Close: Dec 29, 2025
1 ea, duplex strainer, nps 4", bronze body, ANSI CL 150 flat face flanges, 20 perforated holes monel baskets; fluid filtration, NSN: 4730 01-LG2-1282, P/N: 0W6P2 / 72-48F-EQUIV.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis