Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide drainage improvements consisting of storm sewer construction, ranging from 12" to 72" in diameter. Work will include storm sewer and drainage structure installation, pavement and driveway reconstruction, grading, erosion control and all necessary restoration. 15 EA tree pruning (1 to 10" diameter); 15 EA tree pruning (over 10" diameter); 1093 CY earth excavation; 420 CY removal and disposal of unsuitable material; 3445 SY topsoil furnish and place, 4"; 25 pound temporary erosion control seeding; 100' perimeter erosion barrier; 3 EA inlet and pipe protection; 23 EA inlet filters; 416 SY stone riprap, class a3; 828 SY filter fabric; 2027 SY aggregate subgrade improvement 12"; 471 SY subbase granular material, type b 4"; 341 tn hot-mix asphalt binder course, Il-19.0, N50. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Design/Build Services for Spivey Trail Drainage Improvement Project for Clayton County (County), Georgia.
Posted Date
Dec 5, 2025
Due Date
Jan 22, 2026
Release: Dec 5, 2025
Close: Jan 22, 2026
Design/Build Services for Spivey Trail Drainage Improvement Project for Clayton County (County), Georgia.
AvailableThe City of Miami Springs seeks a qualified contractor to construct the South Drive Stormwater and Roadway Improvement Project to provide water quality, stormwater management, and beautification along the South Drive corridor. The scope includes localized drainage, roadway geometry and landscape improvements, enhancements to roundabouts, and measures to accommodate pedestrian, cyclist, and motorist safety while reducing flooding. This opportunity is issued as an Invitation for Bid (ITB) and includes a mandatory pre-bid meeting; supporting bid documents are available on the original posting linked from the aggregator.
Posted Date
Dec 4, 2025
Due Date
Jan 27, 2026
Release: Dec 4, 2025
Close: Jan 27, 2026
The City of Miami Springs seeks a qualified contractor to construct the South Drive Stormwater and Roadway Improvement Project to provide water quality, stormwater management, and beautification along the South Drive corridor. The scope includes localized drainage, roadway geometry and landscape improvements, enhancements to roundabouts, and measures to accommodate pedestrian, cyclist, and motorist safety while reducing flooding. This opportunity is issued as an Invitation for Bid (ITB) and includes a mandatory pre-bid meeting; supporting bid documents are available on the original posting linked from the aggregator.
Work includes installing two stormwater pump stations, control houses, backup power, a motorized sluice gate, drainage structures/piping, drainage canal deepening/widening, water quality structures, an energy dissipation chamber, bulkhead replacement, elevated roadways, utility relocations/offsets, management of contaminated soil and groundwater, traffic control, site work, grading and restoration.
Posted Date
Oct 1, 2025
Due Date
Dec 18, 2025
Release: Oct 1, 2025
Close: Dec 18, 2025
Work includes installing two stormwater pump stations, control houses, backup power, a motorized sluice gate, drainage structures/piping, drainage canal deepening/widening, water quality structures, an energy dissipation chamber, bulkhead replacement, elevated roadways, utility relocations/offsets, management of contaminated soil and groundwater, traffic control, site work, grading and restoration.
project includes: Traffic Control, Removal of Existing 3 x 36" 2 x 54" 2 x 36" RCP, Class B Rip Rap at Box Culverts, Class C Rip Rap to armor downstream channel w/Filter Fabric, 8 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, 6 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, Headwalls / Endwalls, Misc. Erosion Control / Water Management, Utility Relocation (Water and Sewer), 6" Graded Aggregate Base Course Uniform, 2' Asphalt Surface Course, Earthwork Fine Grade Right of Way Shoulders.Seeding / Stabilization, Asphalt Millings for Driveway.
Posted Date
Sep 9, 2025
Due Date
Dec 29, 2025
Release: Sep 9, 2025
Close: Dec 29, 2025
project includes: Traffic Control, Removal of Existing 3 x 36" 2 x 54" 2 x 36" RCP, Class B Rip Rap at Box Culverts, Class C Rip Rap to armor downstream channel w/Filter Fabric, 8 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, 6 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, Headwalls / Endwalls, Misc. Erosion Control / Water Management, Utility Relocation (Water and Sewer), 6" Graded Aggregate Base Course Uniform, 2' Asphalt Surface Course, Earthwork Fine Grade Right of Way Shoulders.Seeding / Stabilization, Asphalt Millings for Driveway.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis