Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
South Carolina Department of Transportation
Work includes clearing and grubbing within roadway, removal and disposal of existing asphalt pavement 4,497.000 SY, removal and disposal of existing bridge, unclassified excavation 3,766.000 CY, borrow excavation 10,144.000 CY, geogrid reinforcement (uniaxial) 621.000 SY, fine grading 4,647.000 SY, flowable fill 80.000 CY, liquid asphalt binder pg64-22 129.000 ton, full depth asph pav patching 10"unif 150.000 SY, asphalt base course - type b 1,820.000 ton, asphalt intermediate course type c 410.000 ton, asphalt surface course type c 401.000 ton. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
South Carolina Department of Transportation
Work includes small public water relocation no 1, clearing and grubbing within right of way, removal and disposal of existing pavement 235.000 SY, removal of exist guardrail 120.000 LF, removal and disposal of existing bridge, unclassified excavation 1,077.000 CY, borrow excavation 9,114. 000 CY, muck excavation 50. 000 CY, geotextile, separation 246. 000 SY, geogrid reinforcement (uniaxial) 1,865.000 SY geogrid stabilization 246.000 SY, stone bridge lift material 200.000 Ton, fine grading 5,084.000 SY, flowable fill 40.000 CY, maintenance stone 63.000 Ton. See attached file.
Posted Date
Nov 4, 2025
Due Date
Dec 9, 2025
Release: Nov 4, 2025
South Carolina Department of Transportation
Close: Dec 9, 2025
Work includes small public water relocation no 1, clearing and grubbing within right of way, removal and disposal of existing pavement 235.000 SY, removal of exist guardrail 120.000 LF, removal and disposal of existing bridge, unclassified excavation 1,077.000 CY, borrow excavation 9,114. 000 CY, muck excavation 50. 000 CY, geotextile, separation 246. 000 SY, geogrid reinforcement (uniaxial) 1,865.000 SY geogrid stabilization 246.000 SY, stone bridge lift material 200.000 Ton, fine grading 5,084.000 SY, flowable fill 40.000 CY, maintenance stone 63.000 Ton. See attached file.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
New Jersey Department of Transportation
DESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
Posted Date
Dec 2, 2024
Due Date
Jan 8, 2026
Release: Dec 2, 2024
New Jersey Department of Transportation
Close: Jan 8, 2026
DESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
AvailableSouth Carolina Department of Transportation
Work includes clearing and grubbing within right of way, removal of exist guardrail 1,218.000 LF, removal and disposal of existing bridge, unclassified excavation 170,695.000 CY, rock excavation for bridges 20,144. 000 CY, temporary shoring system 1,763.000 LF, fine grading 17,087.000 SY, maintenance stone 100. 000 ton, liquid asphalt binder pg64-22 813.000 Ton, milling existing asphalt pavement 10.0" 250.000 SY, milling existing asphalt pavement (variable) 3,277.000 SY, asphalt base course - type a 9,410.000 Ton, asphalt intermediate course type b 3,265.000 Ton. See attached file.
Posted Date
Nov 4, 2025
Due Date
Dec 9, 2025
Release: Nov 4, 2025
South Carolina Department of Transportation
Close: Dec 9, 2025
Work includes clearing and grubbing within right of way, removal of exist guardrail 1,218.000 LF, removal and disposal of existing bridge, unclassified excavation 170,695.000 CY, rock excavation for bridges 20,144. 000 CY, temporary shoring system 1,763.000 LF, fine grading 17,087.000 SY, maintenance stone 100. 000 ton, liquid asphalt binder pg64-22 813.000 Ton, milling existing asphalt pavement 10.0" 250.000 SY, milling existing asphalt pavement (variable) 3,277.000 SY, asphalt base course - type a 9,410.000 Ton, asphalt intermediate course type b 3,265.000 Ton. See attached file.
AvailableMonroe County
Wiler road bridge replacement over west creek.
Posted Date
Nov 14, 2025
Due Date
Dec 19, 2025
Release: Nov 14, 2025
Monroe County
Close: Dec 19, 2025
Wiler road bridge replacement over west creek.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →