Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
South Carolina Department of Transportation
Work includes clearing and grubbing within right of way, removal of exist guardrail 1,218.000 LF, removal and disposal of existing bridge, unclassified excavation 170,695.000 CY, rock excavation for bridges 20,144. 000 CY, temporary shoring system 1,763.000 LF, fine grading 17,087.000 SY, maintenance stone 100. 000 ton, liquid asphalt binder pg64-22 813.000 Ton, milling existing asphalt pavement 10.0" 250.000 SY, milling existing asphalt pavement (variable) 3,277.000 SY, asphalt base course - type a 9,410.000 Ton, asphalt intermediate course type b 3,265.000 Ton. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Monroe County
Wiler road bridge replacement over west creek.
Posted Date
Nov 14, 2025
Due Date
Dec 19, 2025
Release: Nov 14, 2025
Monroe County
Close: Dec 19, 2025
Wiler road bridge replacement over west creek.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Columbus
The City of Columbus, Mississippi seeks bids for the demolition and replacement of the Waterworks Road/Tuscaloosa Road bridge over Luxapallila Creek, requiring all labor and materials as specified. The project has a contract time of 365 days with liquidated damages of $500 per day for delays.
Posted Date
-
Due Date
Dec 15, 2025
City of Columbus
Close: Dec 15, 2025
The City of Columbus, Mississippi seeks bids for the demolition and replacement of the Waterworks Road/Tuscaloosa Road bridge over Luxapallila Creek, requiring all labor and materials as specified. The project has a contract time of 365 days with liquidated damages of $500 per day for delays.
AvailableCity of Columbus
The City of Columbus, Mississippi seeks bids for the demolition and replacement of the Waterworks Road/Tuscaloosa Road bridge over Luxapallila Creek, requiring all labor and materials as specified. The project has a contract time of 365 days with liquidated damages of $500 per day for delays.
Posted Date
-
Due Date
Dec 15, 2025
City of Columbus
Close: Dec 15, 2025
The City of Columbus, Mississippi seeks bids for the demolition and replacement of the Waterworks Road/Tuscaloosa Road bridge over Luxapallila Creek, requiring all labor and materials as specified. The project has a contract time of 365 days with liquidated damages of $500 per day for delays.
AvailableHolmes County
Work includes bridge replacement.
Posted Date
Oct 29, 2025
Due Date
Dec 2, 2025
Release: Oct 29, 2025
Holmes County
Close: Dec 2, 2025
Work includes bridge replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →