Retrieving RFP details
Release
Close
City of Clermont
Provide sanitary sewer condition assessment and lateral rehabilitation services.
City of Georgetown
Perform cure in place pipe (cipp) and sanitary sewer manhole rehabilitation work. Bypass Pumping Operations of Existing Sanitary Sewer, 1,277 LF of Cured-in-Place Pipe 12-in Sewer (Manhole to Manhole), All Depths (ML-15, ML-16, ML-18, & ML-19); 813 LF of Cured-in-Place Pipe 15-in Sewer (Manhole to Manhole), All Depths (ML-5, ML-6); 2,090 LF of Sewer Cleaning/Silt Removal Prior to CCTV- Heavy Cleaning (All Diameters); 12 EA of Reconnect Active Sewer Laterals to CIPP Lined Pipe, All Sizes All Depths; 12 EA of Service Lateral CIPP End Seal; 19 EA of Furnish and Install Flexible Chimney Seal, 24"; 6 EA of Repairing and Rebuilding Brickwork for Inverts, Benches, Walls, and Chimneys in Manholes (1818,1829,1830,1834,1837, and 1839), 173 VF of Sewer Manhole Monolithic Lining, 4-FT Dia. Manhole.
City of Windsor
Project includes sanitary sewer and manhole rehabilitation, involves sewer lining by curing in place pipe (cipp) lining and manhole rehabilitation. The bid for the cipp trunk sewer lining and manhole rehabilitation encompasses but not limited to approx. 6,200 LF of 8" sanitary sewers and 290 VF of manhole rehabilitation, mobilization, demobilization, cleaning, televising, bypass pumping, traffic control, point repairs, surface restoration, and incidentals.
Rolling Creek Utility District
Work includes : sanitary sewer rehabilitation phase 1.
Release
Oct 23, 2025
Close
Dec 04, 2025