Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Elgin
CIPP lining of approx. 2,700' of existing 8" dia. sanitary sewer mains.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Dunedin
Perform rehabilitation and cured-in-place-pipe (cipp) lining of the collection system's sanitary sewer mains, service laterals, and pressurized force mains, as well as stormwater pipes of various diameters and materials.
Posted Date
Nov 7, 2025
Due Date
Dec 9, 2025
Release: Nov 7, 2025
City of Dunedin
Close: Dec 9, 2025
Perform rehabilitation and cured-in-place-pipe (cipp) lining of the collection system's sanitary sewer mains, service laterals, and pressurized force mains, as well as stormwater pipes of various diameters and materials.
AvailableJacksonville Electric Authority (JEA) - Procurement Dept
Work includes sanitary rehabilitation services for cured-in-place pipe (CIPP) lining, cleaning, inspection, and rehabilitation of sanitary sewer pipes. The term of contract is for three years, for two additional one-year periods.
Posted Date
-
Due Date
Jan 13, 2026
Jacksonville Electric Authority (JEA) - Procurement Dept
Close: Jan 13, 2026
Work includes sanitary rehabilitation services for cured-in-place pipe (CIPP) lining, cleaning, inspection, and rehabilitation of sanitary sewer pipes. The term of contract is for three years, for two additional one-year periods.
AvailableCity of Duluth
Work includes 15,492 LF of CIPP lining ranging between 8"-18" pipe. 147 service lateral cuts, 40 chemical grout point repairs and 28 open trench sewer pipe spot repairs with some heavy root cleaning and lining manhole structures.
Posted Date
Nov 6, 2025
Due Date
Nov 26, 2025
Release: Nov 6, 2025
City of Duluth
Close: Nov 26, 2025
Work includes 15,492 LF of CIPP lining ranging between 8"-18" pipe. 147 service lateral cuts, 40 chemical grout point repairs and 28 open trench sewer pipe spot repairs with some heavy root cleaning and lining manhole structures.
AvailableCity of Fridley
Work includes approx 11,041 LF 8" VCP CIPP sanitary sewer lining by water cure; 330 EA lateral reinstatement; 5,742 LF 8" VCP CIPP sanitary sewer by steam cure; sanitary sewer collection system televising, cleaning, inspecting, traffic control, and restoration. See outside link.
Posted Date
Nov 12, 2025
Due Date
Dec 4, 2025
Release: Nov 12, 2025
City of Fridley
Close: Dec 4, 2025
Work includes approx 11,041 LF 8" VCP CIPP sanitary sewer lining by water cure; 330 EA lateral reinstatement; 5,742 LF 8" VCP CIPP sanitary sewer by steam cure; sanitary sewer collection system televising, cleaning, inspecting, traffic control, and restoration. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis