Retrieving RFP details
Release
Close
City of Duluth
Work includes 15,492 LF of CIPP lining ranging between 8"-18" pipe. 147 service lateral cuts, 40 chemical grout point repairs and 28 open trench sewer pipe spot repairs with some heavy root cleaning and lining manhole structures.
City of Dunedin
Perform rehabilitation and cured-in-place-pipe (cipp) lining of the collection system's sanitary sewer mains, service laterals, and pressurized force mains, as well as stormwater pipes of various diameters and materials.
City of Kentwood
Rehabilitate several sanitary lateral lines using Cured-In-Place Pipe (CIPP). If CIPP installation is determined to be infeasible, the need for excavation shall be required.
City of Fridley
Work includes approx 11,041 LF 8" VCP CIPP sanitary sewer lining by water cure; 330 EA lateral reinstatement; 5,742 LF 8" VCP CIPP sanitary sewer by steam cure; sanitary sewer collection system televising, cleaning, inspecting, traffic control, and restoration. See outside link.
Release
Nov 06, 2025
Close
Nov 26, 2025