Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Approx 58 LF Construct 15" RCP, Class III; 68 LF Construct 18" RCP, Class III; 30 LF Construct 21" RCP, Class III; 16 LF Construct 24" RCP, Class III; etc.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
2022 Sanitary Sewer Improvements Contract No. 5 - Sanitary Sewer Improvements.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
2022 Sanitary Sewer Improvements Contract No. 5 - Sanitary Sewer Improvements.
AvailablePremium
Access the largest public sector contact database
This project includes improvements to the existing duplex lift station serving the Boeing Maintenance Facility. Upgrades to the lift station include replacing both pumps and pump controls, other miscellaneous equipment, the existing equipment access hatch, and adding a flow meter and structure. Also included is the rehabilitation of portions of the storm sewer system using trenchless technologies such as cured-in-place-pipe (CIPP) lining, root cutting, and heavy cleaning for the sewer pipes. Rehabilitation of the affected storm sewer structures includes cleaning inlets and pipe end sections, replacing inlet lids and broken end sections, and installation of trash racks in end sections. Additionally, the rehabilitation of portions of the sanitary sewer system using cured-in-place-pipe (CIPP) lining, Point Repair, and Trenchless CIPP Point Liner is included. Rehabilitation of the affected sanitary sewer structures includes manhole lining and replacing manhole steps.
Posted Date
Oct 20, 2025
Due Date
Jan 8, 2026
Release: Oct 20, 2025
Close: Jan 8, 2026
This project includes improvements to the existing duplex lift station serving the Boeing Maintenance Facility. Upgrades to the lift station include replacing both pumps and pump controls, other miscellaneous equipment, the existing equipment access hatch, and adding a flow meter and structure. Also included is the rehabilitation of portions of the storm sewer system using trenchless technologies such as cured-in-place-pipe (CIPP) lining, root cutting, and heavy cleaning for the sewer pipes. Rehabilitation of the affected storm sewer structures includes cleaning inlets and pipe end sections, replacing inlet lids and broken end sections, and installation of trash racks in end sections. Additionally, the rehabilitation of portions of the sanitary sewer system using cured-in-place-pipe (CIPP) lining, Point Repair, and Trenchless CIPP Point Liner is included. Rehabilitation of the affected sanitary sewer structures includes manhole lining and replacing manhole steps.
AvailableWork includes sanitary sewer improvements project.
Posted Date
Nov 13, 2025
Due Date
Dec 22, 2025
Release: Nov 13, 2025
Close: Dec 22, 2025
Work includes sanitary sewer improvements project.
AvailableReconstruction of street. Storm sewer installation and construction of a stormwater detention basin. The reconstruction of street will include installation of sidewalk, curb, storm sewer, water line relocation, and sanitary sewer relocation.
Posted Date
Dec 1, 2025
Due Date
Dec 22, 2025
Release: Dec 1, 2025
Close: Dec 22, 2025
Reconstruction of street. Storm sewer installation and construction of a stormwater detention basin. The reconstruction of street will include installation of sidewalk, curb, storm sewer, water line relocation, and sanitary sewer relocation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis