Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
County of Santa Clara
Furnishing of all labor, material, superintendence, power, light, tools, appliances, equipment, machinery, supplies, certifications, services, and other means of construction necessary or proper for performing and completing the work. Removal of existing gate, pavement striping, fencing and all other work as shown in the drawings;clearing and grubbing, saw cutting, and concrete removal as shown in the drawings; installation of canopy post drilled pier footings as shown in the drawings; installation of a pre-engineered aluminum canopy covering the walkway between the hospital and an existing mri trailer, and includes the provision of lighting and associated site improvements to facilitate canopy installation; and the installation of new linear led light fixtures and all other associated electrical work as shown in the drawings.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
University Of Connecticut
The Project consists of exterior and interior renovations to provide provisions to support a mobile MRI trailer, and also modifies parking and drive lanes for additional ADA parking spaces. The project also includes renovation work to add a new dedicated chiller outside of the F / T buildings, to support the MRI in Building T main level.
Posted Date
Nov 14, 2025
Due Date
Dec 8, 2025
Release: Nov 14, 2025
University Of Connecticut
Close: Dec 8, 2025
The Project consists of exterior and interior renovations to provide provisions to support a mobile MRI trailer, and also modifies parking and drive lanes for additional ADA parking spaces. The project also includes renovation work to add a new dedicated chiller outside of the F / T buildings, to support the MRI in Building T main level.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Graham Regional Medical Center
construction and renovation work associated with the MRI Upgrade/Installation (GE Artist EVO 1.5T) and the R/F Room Upgrade/Installation (GE Discovery 180) at Graham Regional Medical Center
Posted Date
Nov 27, 2025
Due Date
Dec 17, 2025
Release: Nov 27, 2025
Graham Regional Medical Center
Close: Dec 17, 2025
construction and renovation work associated with the MRI Upgrade/Installation (GE Artist EVO 1.5T) and the R/F Room Upgrade/Installation (GE Discovery 180) at Graham Regional Medical Center
AvailableCity of Birmingham
Work includes : 340 SY 4" concrete sidewalks; 120 SY 6" heavy duty concrete paving; 550 LF 18" concrete curb & gutter; 200 LF 6" concrete curb; and items relating to installation of pedestrian signals.
Posted Date
Oct 16, 2025
Due Date
Dec 3, 2025
Release: Oct 16, 2025
City of Birmingham
Close: Dec 3, 2025
Work includes : 340 SY 4" concrete sidewalks; 120 SY 6" heavy duty concrete paving; 550 LF 18" concrete curb & gutter; 200 LF 6" concrete curb; and items relating to installation of pedestrian signals.
AvailableUniversity Of California San Francisco
Design Build Provide MRI Upgrade .
Posted Date
-
Due Date
Dec 2, 2025
Release: -
University Of California San Francisco
Close: Dec 2, 2025
Design Build Provide MRI Upgrade .
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →