Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Birmingham
Work includes : 340 SY 4" concrete sidewalks; 120 SY 6" heavy duty concrete paving; 550 LF 18" concrete curb & gutter; 200 LF 6" concrete curb; and items relating to installation of pedestrian signals.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
School District of Philadelphia
Tree Canopy Program.
Posted Date
Nov 3, 2025
Due Date
Dec 11, 2025
Release: Nov 3, 2025
School District of Philadelphia
Close: Dec 11, 2025
Tree Canopy Program.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
County of Santa Clara
Furnishing of all labor, material, superintendence, power, light, tools, appliances, equipment, machinery, supplies, certifications, services, and other means of construction necessary or proper for performing and completing the work. Removal of existing gate, pavement striping, fencing and all other work as shown in the drawings;clearing and grubbing, saw cutting, and concrete removal as shown in the drawings; installation of canopy post drilled pier footings as shown in the drawings; installation of a pre-engineered aluminum canopy covering the walkway between the hospital and an existing mri trailer, and includes the provision of lighting and associated site improvements to facilitate canopy installation; and the installation of new linear led light fixtures and all other associated electrical work as shown in the drawings.
Posted Date
-
Due Date
Jan 15, 2026
County of Santa Clara
Close: Jan 15, 2026
Furnishing of all labor, material, superintendence, power, light, tools, appliances, equipment, machinery, supplies, certifications, services, and other means of construction necessary or proper for performing and completing the work. Removal of existing gate, pavement striping, fencing and all other work as shown in the drawings;clearing and grubbing, saw cutting, and concrete removal as shown in the drawings; installation of canopy post drilled pier footings as shown in the drawings; installation of a pre-engineered aluminum canopy covering the walkway between the hospital and an existing mri trailer, and includes the provision of lighting and associated site improvements to facilitate canopy installation; and the installation of new linear led light fixtures and all other associated electrical work as shown in the drawings.
AvailableCity of Lancaster
Tree Removal, Stump Removal/Grinding and Tree Pruning at 685 City Right-of-Way tree well locations. Project includes tree removal, stump removal/grinding, and tree pruning in tree wells in the right-of-way (ROW) throughout the City.
Posted Date
Oct 31, 2025
Due Date
Dec 5, 2025
Release: Oct 31, 2025
City of Lancaster
Close: Dec 5, 2025
Tree Removal, Stump Removal/Grinding and Tree Pruning at 685 City Right-of-Way tree well locations. Project includes tree removal, stump removal/grinding, and tree pruning in tree wells in the right-of-way (ROW) throughout the City.
AvailableHarris County Metropolitan Transit Authority
Project is to clean, prime, remove rust and paint the support and canopy steel structures at rail platforms.
Posted Date
Nov 24, 2025
Due Date
Jan 7, 2026
Release: Nov 24, 2025
Harris County Metropolitan Transit Authority
Close: Jan 7, 2026
Project is to clean, prime, remove rust and paint the support and canopy steel structures at rail platforms.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →