Retrieving RFP details
Release
Close
City of Lacey
Drilling to 500 FT and constructing, developing, and testing one 16" diameter production well. A surface seal will be installed at a depth of 38 feet. The final depth and completion of the production well will be confirmed based on observations during drilling and grain-size testing results. The production well will be constructed in one of two ways: 1) shallow completion with natural pack from approx. 255 to 310 FT; or 2) deep completion with engineered pack from approx. 400 to 490 FT.
Final-Specifications_S06-WR-Grays-Prod-Well
Metro Flood Diversion Authority
The project consists of constructing two (2) 12" potable water production wells, including well casings screens, and test pumping each well.
City of Plattsburgh
The project involves the installation and construction of a municipal drinking water production well and associated development and testing.
City of Bristol
Work includes installation of a new deep-water production well with connection to the citys water system.
Orange Beach Water Sewer And Fire Protection Authority
The construction of a new water supply well; including well building, site work, electrical, along with approx. 8,350 LF of 12" potable water main, 2,560 LF of 20" raw water main, approx. 8270 LF of 6" sanitary sewer force main and related appurtenances.
Release
Oct 08, 2025
Close
Oct 29, 2025