Retrieving RFP details
Release
Close
California Department of Transportation
Work consists of rubberized hma, minor concrete (curb, gutter, sidewalk, and driveway) includes, 27 SF of temporary pavement marking (paint); 700 LF of temporary traffic stripe (paint); 860 LF of temporary barrier system; 7,000 LF of temporary fiber roll; 700 LF of temporary high-visibility fence; 1,440 CY of roadway excavation; 1,080 SF of rock blanket; 74 CY of wood mulch; 500 SF of remove and replace brick pavement; 850 TON of hot mix asphalt (type a); 8,140 TON of rubberized hot mix asphalt (gap graded); 59,400 SY of cold plane asphalt concrete pavement; 1,840 SF of detectable warning surface; 3,390 SF of minor concrete; 15,200 SF of thermoplastic pavement marking; 14,800 LF of 6" thermoplastic traffic stripe; 3,890 LF of 8" thermoplastic traffic stripe. See attached files.
Rubberized HMA, Minor Concrete (Curb, Gutter, Sidewalk, and Driveway)
zip
City of Fullerton
The work shall consist of, but not limited to, sidewalk, curb and gutter, pcc curb only, and driveway approaches, including root pruning and clear and grub of tree roots for concrete reconstruction.
City of West Covina
Work components include the removal and replacement of concrete sidewalk, driveway approach, curb & gutter, and curb ramps at various locations citywide. Work includes repainting address marking and replacing existing monuments if disturbed.
City of Riverside
Project proposes to remove and replace broken concrete curb, gutter, sidewalk and ADA ramps at various locations throughout the city. The project also includes construction of new concrete driveways and sidewalk.
Release
Oct 13, 2025
Close
Nov 20, 2025