Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of basketball units. Replacement of existing light poles and upgrade to LED lights. Install dry wells, drainpipes, and electrical conduits. Replace sand in tot lot with crushed rock base and 2-layer pour-in-place playground surfacing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Phase I Electrical Site Enabling project is the initial interim step to re-feed the Von Braun Center (VBC) with a primary 12,470V utility source from the north side of Clinton Street. This work is in preparation for the future Phase III Exhibit Hall Expansion (N.I.C.). The Phase I Electrical Site Enabling scope includes: Testing of the existing MV system (MV-LS1, MV-LS2, MV-LS3, and all MV cabling runs; Installation of a new dual-chimney manhole; Installation of new HU interim switch and metering equipment (at grade near the Mars Music Hall docks). See outside link.
Posted Date
Nov 21, 2025
Due Date
Dec 16, 2025
Release: Nov 21, 2025
Close: Dec 16, 2025
Premium
Access the largest public sector contact database
The Phase I Electrical Site Enabling project is the initial interim step to re-feed the Von Braun Center (VBC) with a primary 12,470V utility source from the north side of Clinton Street. This work is in preparation for the future Phase III Exhibit Hall Expansion (N.I.C.). The Phase I Electrical Site Enabling scope includes: Testing of the existing MV system (MV-LS1, MV-LS2, MV-LS3, and all MV cabling runs; Installation of a new dual-chimney manhole; Installation of new HU interim switch and metering equipment (at grade near the Mars Music Hall docks). See outside link.
AvailableWork includes construction of skatepark, basketball court, tennis court, children playground, water play splash pad, outdoor fitness area with equipment, park storage building, renovation of park lighting and electrical system, renovation of the park landscape and irrigation system, furnishing and installing park site furnishings and amenities, and other improvements.
Posted Date
Nov 10, 2025
Due Date
Dec 17, 2025
Release: Nov 10, 2025
Close: Dec 17, 2025
Work includes construction of skatepark, basketball court, tennis court, children playground, water play splash pad, outdoor fitness area with equipment, park storage building, renovation of park lighting and electrical system, renovation of the park landscape and irrigation system, furnishing and installing park site furnishings and amenities, and other improvements.
AvailableDrainage improvements, including installation of inlets, pipes, curb, performed scour hole, concrete headwall and pavement repairs.
Posted Date
Nov 29, 2025
Due Date
Dec 18, 2025
Release: Nov 29, 2025
Close: Dec 18, 2025
Drainage improvements, including installation of inlets, pipes, curb, performed scour hole, concrete headwall and pavement repairs.
AvailableWork includes demolition/removal; grading/drainage; concrete work; play area development; poured-in-place rubber surfacing; ballfield development; basketball court development; fencing; turf restoration; native seeding.
Posted Date
Nov 26, 2025
Due Date
Jan 7, 2026
Release: Nov 26, 2025
Close: Jan 7, 2026
Work includes demolition/removal; grading/drainage; concrete work; play area development; poured-in-place rubber surfacing; ballfield development; basketball court development; fencing; turf restoration; native seeding.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis