Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide Round and Arched Pipe.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
12 ga. Metal culverts sizes ranging from 12" to 42" dia. and various lengths plain and coated and round and arched plastic culverts sizes ranging from 12" to 42" dia. and 4" perforated and non-perforated coils. Also being bid are connection bands for both types of culverts.
Posted Date
Dec 11, 2025
Due Date
Dec 18, 2025
Release: Dec 11, 2025
Close: Dec 18, 2025
12 ga. Metal culverts sizes ranging from 12" to 42" dia. and various lengths plain and coated and round and arched plastic culverts sizes ranging from 12" to 42" dia. and 4" perforated and non-perforated coils. Also being bid are connection bands for both types of culverts.
Premium
Access the largest public sector contact database
Provide construction of 11 maintenance holes, and the rehabilitation of 6,700 LF of pipe-in-pipe sanitary sewer using cured in place pipe.
Posted Date
Nov 6, 2025
Due Date
Jan 13, 2026
Release: Nov 6, 2025
Close: Jan 13, 2026
Provide construction of 11 maintenance holes, and the rehabilitation of 6,700 LF of pipe-in-pipe sanitary sewer using cured in place pipe.
AvailableBus pipe, copper, extra strong, hard tempered, round, 1" international pipe standard (ips), schedule 80, outside diameter: 1.315", wall thickness: 0.182. Furnished in 20-foot lengths, in accordance with attached specifications p133. All shipments must be delivered on a flatbed truck capable of unloading with a forklift on three sides. Shipments that do not come on a flatbed truck will be refused at the vendor's expense, 1,000 foot.
Posted Date
Dec 8, 2025
Due Date
Dec 19, 2025
Release: Dec 8, 2025
Close: Dec 19, 2025
Bus pipe, copper, extra strong, hard tempered, round, 1" international pipe standard (ips), schedule 80, outside diameter: 1.315", wall thickness: 0.182. Furnished in 20-foot lengths, in accordance with attached specifications p133. All shipments must be delivered on a flatbed truck capable of unloading with a forklift on three sides. Shipments that do not come on a flatbed truck will be refused at the vendor's expense, 1,000 foot.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis