Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Roofing replacement and gutter cleaning. Property consists of forty-eight (48) two-bedroom duplex units.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Roofing replacement and gutter cleaning. Property consists of forty-eight (48) two-bedroom duplex units.
Posted Date
Oct 24, 2025
Due Date
Dec 18, 2025
Release: Oct 24, 2025
Close: Dec 18, 2025
Roofing replacement and gutter cleaning. Property consists of forty-eight (48) two-bedroom duplex units.
AvailablePremium
Access the largest public sector contact database
The City of Hemet seeks a qualified contractor to remove two existing pumps and control panels and supply and install two new pumps and control panels at the Stoney Mountain location in Hemet, CA. Electronic bids are requested and the project is scheduled to start ASAP with a 20-calendar-day duration; see the PlanetBids documents tab for full specifications and submittal instructions.
Posted Date
Dec 2, 2025
Due Date
Dec 22, 2025
Release: Dec 2, 2025
Close: Dec 22, 2025
The City of Hemet seeks a qualified contractor to remove two existing pumps and control panels and supply and install two new pumps and control panels at the Stoney Mountain location in Hemet, CA. Electronic bids are requested and the project is scheduled to start ASAP with a 20-calendar-day duration; see the PlanetBids documents tab for full specifications and submittal instructions.
AvailableRoofing replacement.
Posted Date
Dec 1, 2025
Due Date
Dec 15, 2025
Release: Dec 1, 2025
Close: Dec 15, 2025
Roofing replacement.
AvailableWork includes rehab of four units (640,641,644 and 645). Property consists of forty-eight (48) two-bedroom duplex units. Demolition: Remove all flooring down to the substrates throughout the entire unit. The substrates shall be sound, dry, clean, smooth and free from excessive moisture or alkali. The surface shall be free of dust, solvents, varnish, paint, wax, oil, grease, residual adhesive, or other foreign material that might affect the adhesion of new flooring, telegraph up to the surface or bleed through new flooring. Replace the dryer exhaust duct that terminates through the sidewall and discharged outdoors in accordance with Section M1506.3. See attached file.
Posted Date
Dec 4, 2025
Due Date
Jan 2, 2026
Release: Dec 4, 2025
Close: Jan 2, 2026
Work includes rehab of four units (640,641,644 and 645). Property consists of forty-eight (48) two-bedroom duplex units. Demolition: Remove all flooring down to the substrates throughout the entire unit. The substrates shall be sound, dry, clean, smooth and free from excessive moisture or alkali. The surface shall be free of dust, solvents, varnish, paint, wax, oil, grease, residual adhesive, or other foreign material that might affect the adhesion of new flooring, telegraph up to the surface or bleed through new flooring. Replace the dryer exhaust duct that terminates through the sidewall and discharged outdoors in accordance with Section M1506.3. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis