Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The New York State Office of Parks, Recreation and Historic Preservation (OPRHP) seeks a contractor to replace the roofs on three cabins (727, 729, and 730) in Harriman State Park. The scope of work includes removal of existing shingles, wood repairs, installation of 1/2" plywood sheathing on cabin 727, new fascia, ice and water shield, drip edge, GAF architectural shingles, flashing and site cleanup. Work is to be completed outside the camping season during weekdays with an expected completion by December 2025.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include remove existing shingles. Make necessary wood repairs with similar decking. 0. 5" plywood sheathing over the entire roof of the one cabin #727. Install new facia board 1"x6" pt pine; ice and water shield 6 up and in valleys, tar paper the remainder of the roof. Install new brown drip edge; install new architectural gaf starter shingles and shingles in charcoal color with 1. 25" roofing nails. Install new architectural cap shingles on ridge and hips in charcoal color with 2" roofing nails. Install proper flashing around all roof penetrations. New rubber boots for plumbing vents and electrical mast pipe locations
Posted Date
Dec 2, 2025
Due Date
Dec 23, 2025
Release: Dec 2, 2025
Close: Dec 23, 2025
Work include remove existing shingles. Make necessary wood repairs with similar decking. 0. 5" plywood sheathing over the entire roof of the one cabin #727. Install new facia board 1"x6" pt pine; ice and water shield 6 up and in valleys, tar paper the remainder of the roof. Install new brown drip edge; install new architectural gaf starter shingles and shingles in charcoal color with 1. 25" roofing nails. Install new architectural cap shingles on ridge and hips in charcoal color with 2" roofing nails. Install proper flashing around all roof penetrations. New rubber boots for plumbing vents and electrical mast pipe locations
AvailableSingle-prime contractor required to perform window replacement for Whitetail Woods camper cabins (Farmington, MN). Scope includes removal and installation of cabin windows; estimated construction cost $200,000. Procurement requires prevailing wages, county bid form submission, 5% bid security, and 100% performance and payment bonds. Substantial Completion required by June 30, 2026.
Posted Date
Nov 27, 2025
Due Date
Dec 18, 2025
Release: Nov 27, 2025
Close: Dec 18, 2025
Single-prime contractor required to perform window replacement for Whitetail Woods camper cabins (Farmington, MN). Scope includes removal and installation of cabin windows; estimated construction cost $200,000. Procurement requires prevailing wages, county bid form submission, 5% bid security, and 100% performance and payment bonds. Substantial Completion required by June 30, 2026.
AvailableRoof replacement.
Posted Date
Nov 26, 2025
Due Date
Dec 30, 2025
Release: Nov 26, 2025
Close: Dec 30, 2025
Roof replacement.
AvailableHQ roof replacement.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Close: Dec 18, 2025
HQ roof replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis