Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Roll-up door repair minneapolis va medical center.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Department of Veterans Affairs (Network Contract Office 23) solicits contractors to repair the Trash Room overhead roll-up door at the Minneapolis VA Medical Center, including replacing damaged insulated slats, brush seals, retainers, hardware, and ensuring sensors and safety mechanisms function properly. The contract requires the contractor to provide all tools, equipment, materials, labor, and to follow safety procedures (including Lock Out/Tag Out) with anticipated work hours MondayFriday 6:00 am6:00 pm. The estimated period of performance is January 2, 2026 through March 2, 2026 and the procurement is a Small Business set-aside under NAICS 238290.
Posted Date
Dec 12, 2025
Due Date
Dec 29, 2025
Release: Dec 12, 2025
Premium
Access the largest public sector contact database
The Department of Veterans Affairs (Network Contract Office 23) solicits contractors to repair the Trash Room overhead roll-up door at the Minneapolis VA Medical Center, including replacing damaged insulated slats, brush seals, retainers, hardware, and ensuring sensors and safety mechanisms function properly. The contract requires the contractor to provide all tools, equipment, materials, labor, and to follow safety procedures (including Lock Out/Tag Out) with anticipated work hours MondayFriday 6:00 am6:00 pm. The estimated period of performance is January 2, 2026 through March 2, 2026 and the procurement is a Small Business set-aside under NAICS 238290.
AvailableRoll-up door maintenance and repair.
Posted Date
Nov 26, 2025
Due Date
Dec 23, 2025
Release: Nov 26, 2025
Close: Dec 23, 2025
Roll-up door maintenance and repair.
AvailableRoll up door inspection, maintenance and repair services.
Posted Date
Dec 3, 2025
Due Date
Dec 29, 2025
Release: Dec 3, 2025
Close: Dec 29, 2025
Roll up door inspection, maintenance and repair services.
AvailableWork includes removal of conduit/wiring and installation of 16' x 16' manual chain-pull roll-up door, remove siding and insulation in designated opening area, prepare wall opening for framing and door installation, remove debris and maintain safe work area, structural framing, install framing to support new 16' x 16' roll-up door, install headers, supports, and ensure opening is square and plumb, roll-up door installation, provide and install one (1) 16' x 16' manual chain-pull drum roll-up door, install tracks, guides, brackets, chain hoist, and weather seals, test and adjust door for smooth and safe operation, cleanup and disposal.
Posted Date
Dec 10, 2025
Due Date
Dec 18, 2025
Release: Dec 10, 2025
Close: Dec 18, 2025
Work includes removal of conduit/wiring and installation of 16' x 16' manual chain-pull roll-up door, remove siding and insulation in designated opening area, prepare wall opening for framing and door installation, remove debris and maintain safe work area, structural framing, install framing to support new 16' x 16' roll-up door, install headers, supports, and ensure opening is square and plumb, roll-up door installation, provide and install one (1) 16' x 16' manual chain-pull drum roll-up door, install tracks, guides, brackets, chain hoist, and weather seals, test and adjust door for smooth and safe operation, cleanup and disposal.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis