Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rising spring development concrete package
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes : 560 LF temporary slope drains; 1 EA modifaction to temporary sediment basin; 9 EA culvert inlet protection; 1,700 LF silt sock (sediment retention roll); 500 CY muck excavation; 120 LF 15" class v, rcp; 148 LF 18" class v, rcp; see outside link.
Posted Date
Dec 2, 2025
Due Date
Jan 7, 2026
Release: Dec 2, 2025
Close: Jan 7, 2026
Work includes : 560 LF temporary slope drains; 1 EA modifaction to temporary sediment basin; 9 EA culvert inlet protection; 1,700 LF silt sock (sediment retention roll); 500 CY muck excavation; 120 LF 15" class v, rcp; 148 LF 18" class v, rcp; see outside link.
Premium
Access the largest public sector contact database
Release: Nov 26, 2025
Close: Jan 8, 2026
Bank renovations - phase 2
AvailableProject includes : demolition; cast in place concrete; reinforcing supply; masonry; structural & misc steel supply; structural steel & precast erection; roofing & sheet metal; wire mesh partitions; fire suppression - prequalification required; plumbing - prequalification required; hvac - prequalification required; electrical, communications, security - prequalification required; earthwork; site utilities; surveying. See attached file.
Posted Date
Nov 24, 2025
Due Date
Dec 18, 2025
Release: Nov 24, 2025
Close: Dec 18, 2025
Project includes : demolition; cast in place concrete; reinforcing supply; masonry; structural & misc steel supply; structural steel & precast erection; roofing & sheet metal; wire mesh partitions; fire suppression - prequalification required; plumbing - prequalification required; hvac - prequalification required; electrical, communications, security - prequalification required; earthwork; site utilities; surveying. See attached file.
AvailableThe Texas Facilities Commission (TFC) seeks proposals to provide a comprehensive furniture and fixture equipment (FFE) package including design, manufacture, delivery, and installation of modular and office furniture, seating, conference furniture, and outdoor furniture for tenant spaces in two state office buildings at 1500 Congress and 1501 Lavaca. The procurement requires vendor qualifications, HUB subcontracting compliance, mandatory pre-proposal teleconferences, and proposes evaluation weighted heavily on compensation and fees; estimated budget for the package is approximately $15,000,000.
Posted Date
Dec 2, 2025
Due Date
Jan 27, 2026
Release: Dec 2, 2025
Close: Jan 27, 2026
The Texas Facilities Commission (TFC) seeks proposals to provide a comprehensive furniture and fixture equipment (FFE) package including design, manufacture, delivery, and installation of modular and office furniture, seating, conference furniture, and outdoor furniture for tenant spaces in two state office buildings at 1500 Congress and 1501 Lavaca. The procurement requires vendor qualifications, HUB subcontracting compliance, mandatory pre-proposal teleconferences, and proposes evaluation weighted heavily on compensation and fees; estimated budget for the package is approximately $15,000,000.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis