Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Red Bluff is soliciting qualified contractors to replace the sanitary sewer main on Rio Street and perform related sewer work on River Park Way, including mobilization, sewer bypass, temporary traffic control, and pavement work. Sealed proposals are due in person to the City of Red Bluff on December 9, 2025 at 3:00 PM; a mandatory pre-bid meeting is listed and questions are due December 1, 2025.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Sewer force main replacement project.
Posted Date
Nov 5, 2025
Due Date
Dec 19, 2025
Release: Nov 5, 2025
Close: Dec 19, 2025
Sewer force main replacement project.
AvailablePremium
Access the largest public sector contact database
Sewer replacement work on Central Street that includes the replacement of ductile iron water mains; replacement of vitrified clay sewer pipes; replacement of water services and sewer laterals from the main to the back of sidewalk; replacement of hydrants, butterfly valves, and all other applicable water and sewer appurtenant work.
Posted Date
Nov 20, 2025
Due Date
Dec 23, 2025
Release: Nov 20, 2025
Close: Dec 23, 2025
Sewer replacement work on Central Street that includes the replacement of ductile iron water mains; replacement of vitrified clay sewer pipes; replacement of water services and sewer laterals from the main to the back of sidewalk; replacement of hydrants, butterfly valves, and all other applicable water and sewer appurtenant work.
AvailableSewer replacement work on Central Street that includes the replacement of ductile iron water mains; replacement of vitrified clay sewer pipes; replacement of water services and sewer laterals from the main to the back of sidewalk; replacement of hydrants, butterfly valves, and all other applicable water and sewer appurtenant work.
Posted Date
Nov 20, 2025
Due Date
Dec 23, 2025
Release: Nov 20, 2025
Close: Dec 23, 2025
Sewer replacement work on Central Street that includes the replacement of ductile iron water mains; replacement of vitrified clay sewer pipes; replacement of water services and sewer laterals from the main to the back of sidewalk; replacement of hydrants, butterfly valves, and all other applicable water and sewer appurtenant work.
AvailableThe City of Covington is soliciting bids for a sanitary sewer rehabilitation project including pipe bursting of approximately 1,740 feet of 8-inch sewer and 760 feet of 12-inch sewer, open-cut replacement of 8-inch sewer, replacement of about 55 laterals, reconnection of 5 laterals, and open-cut replacement of 20 manholes. Additional tasks include CCTV pre-lining, CIPP lining, external point repairs, trenchless cleanouts, and manhole rehabilitation; the work is to be performed in Covington, Virginia. The contract requires substantial completion within 240 calendar days and final completion/payment readiness within 270 calendar days.
Posted Date
Dec 5, 2025
Due Date
Dec 16, 2025
Release: Dec 5, 2025
Close: Dec 16, 2025
The City of Covington is soliciting bids for a sanitary sewer rehabilitation project including pipe bursting of approximately 1,740 feet of 8-inch sewer and 760 feet of 12-inch sewer, open-cut replacement of 8-inch sewer, replacement of about 55 laterals, reconnection of 5 laterals, and open-cut replacement of 20 manholes. Additional tasks include CCTV pre-lining, CIPP lining, external point repairs, trenchless cleanouts, and manhole rehabilitation; the work is to be performed in Covington, Virginia. The contract requires substantial completion within 240 calendar days and final completion/payment readiness within 270 calendar days.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis