Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Asheville
The City of Asheville issued an RFQ for city-wide roadway structures repairs and replacements to address damage from the Helene event; the project is federally funded and includes inspection, damage assessment, and the design of repairs or replacements. Qualifications are due December 15, 2025 and the projected period of performance begins February 24, 2026.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Asheville
Provide structural inspection, damage assessment services, and analysis for permanent improvements of city-owned infrastructure, repair or replacement designs for damaged infrastructure.
Posted Date
Nov 20, 2025
Due Date
Dec 19, 2025
Release: Nov 20, 2025
City of Asheville
Close: Dec 19, 2025
Provide structural inspection, damage assessment services, and analysis for permanent improvements of city-owned infrastructure, repair or replacement designs for damaged infrastructure.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Phoenix
The City of Phoenix (Phoenix Housing) is soliciting sealed offers for fence supply and related services under a five-year, federally funded contract beginning on or about March 1, 2026. The solicitation is posted on the City of Phoenix procurement portal (OpenGov) with a response deadline of January 5, 2026.
Posted Date
-
Due Date
Jan 5, 2026
City of Phoenix
Close: Jan 5, 2026
The City of Phoenix (Phoenix Housing) is soliciting sealed offers for fence supply and related services under a five-year, federally funded contract beginning on or about March 1, 2026. The solicitation is posted on the City of Phoenix procurement portal (OpenGov) with a response deadline of January 5, 2026.
AvailableTown of Ball
The work to be performed consists of replacing drainage crossings at five (5) sites and relocating the sewer mains at a sixth (6th) site to accommodate an LDOTD bridge replacement project. The drainage conduits at each site are to be replaced with new reinforced concrete box culverts that vary in size from 7-5 span up to 9-9 span. The project will also include the installation of rip rap, erosion control blankets, P.C.C. pavement, sewer mains, sewer manholes, etc. All work is to take place within town owned property, servitudes, and/or right-of ways.
Posted Date
Oct 3, 2025
Due Date
Dec 3, 2025
Release: Oct 3, 2025
Town of Ball
Close: Dec 3, 2025
The work to be performed consists of replacing drainage crossings at five (5) sites and relocating the sewer mains at a sixth (6th) site to accommodate an LDOTD bridge replacement project. The drainage conduits at each site are to be replaced with new reinforced concrete box culverts that vary in size from 7-5 span up to 9-9 span. The project will also include the installation of rip rap, erosion control blankets, P.C.C. pavement, sewer mains, sewer manholes, etc. All work is to take place within town owned property, servitudes, and/or right-of ways.
AvailableDodge County
Hurricane Helene damage repairs will consist of various construction items including traffic control, grading complete, placing triple surface treatment with 5, 7, & 89 stone, installing new driveway pipes and storm drains, installing type 3 rip rap with filter fabric. Milling, raising center line profile in one area, 19 MM deep patching, 12.5 MM superpave asphalt, and type c turf establishment.
Posted Date
Oct 22, 2025
Due Date
Dec 2, 2025
Release: Oct 22, 2025
Dodge County
Close: Dec 2, 2025
Hurricane Helene damage repairs will consist of various construction items including traffic control, grading complete, placing triple surface treatment with 5, 7, & 89 stone, installing new driveway pipes and storm drains, installing type 3 rip rap with filter fabric. Milling, raising center line profile in one area, 19 MM deep patching, 12.5 MM superpave asphalt, and type c turf establishment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →