Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Phoenix
The City of Phoenix (Phoenix Housing) is soliciting sealed offers for fence supply and related services under a five-year, federally funded contract beginning on or about March 1, 2026. The solicitation is posted on the City of Phoenix procurement portal (OpenGov) with a response deadline of January 5, 2026.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Asheville
The City of Asheville issued an RFQ for city-wide roadway structures repairs and replacements to address damage from the Helene event; the project is federally funded and includes inspection, damage assessment, and the design of repairs or replacements. Qualifications are due December 15, 2025 and the projected period of performance begins February 24, 2026.
Posted Date
-
Due Date
Dec 15, 2025
City of Asheville
Close: Dec 15, 2025
The City of Asheville issued an RFQ for city-wide roadway structures repairs and replacements to address damage from the Helene event; the project is federally funded and includes inspection, damage assessment, and the design of repairs or replacements. Qualifications are due December 15, 2025 and the projected period of performance begins February 24, 2026.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
DeSoto County
Work consists of Sidewalk Construction Services for C.R. 760A.
Posted Date
Nov 16, 2025
Due Date
Dec 12, 2025
Release: Nov 16, 2025
DeSoto County
Close: Dec 12, 2025
Work consists of Sidewalk Construction Services for C.R. 760A.
AvailableMetropolitan Transportation Authority (MTA) - Long Island Rail Road (LIRR)
Qualified contractors to provide for on-call construction services in support of the Grade Crossing Safety Improvement Program (“GCSIP”).
Posted Date
-
Due Date
Dec 4, 2025
Metropolitan Transportation Authority (MTA) - Long Island Rail Road (LIRR)
Close: Dec 4, 2025
Qualified contractors to provide for on-call construction services in support of the Grade Crossing Safety Improvement Program (“GCSIP”).
AvailableCity of Philadelphia
Work includes but is not limited to, pavement rehabilitation, upgrades to airfield signage and lighting, drainage upgrades as well as temporary and permanent pavement striping that also includes 2 EA slab replacement for tether block installation; 1,600 SY variable depth asphalt milling; 1,600 SY variable depth asphalt milling; 3,500 SY concrete and asphalt base removal; 1 ls removal of pipes and other buried structures. See attached file.
Posted Date
Nov 6, 2025
Due Date
Dec 16, 2025
Release: Nov 6, 2025
City of Philadelphia
Close: Dec 16, 2025
Work includes but is not limited to, pavement rehabilitation, upgrades to airfield signage and lighting, drainage upgrades as well as temporary and permanent pavement striping that also includes 2 EA slab replacement for tether block installation; 1,600 SY variable depth asphalt milling; 1,600 SY variable depth asphalt milling; 3,500 SY concrete and asphalt base removal; 1 ls removal of pipes and other buried structures. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →