Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Kent County
Work includes residential moisture control, structural & electrical upgrades, install steel jackpost and short beam under floor to help take spring out of floor; 90 LF install new gutter system strapped to roof overhang; 90 LF install 24" wide x 18" deep gravity system along east & west foundation wall w? 10' extentions. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Kent County
Work includes electrical upgrade, water heater removal and replacement, and crawl space weatherization; install a 40 gallon, glass lined, minimum. 67 energy factor (ef), power vented, insulated to minimum r-16, gas fired water heater with a 6 year warranty. Include pressure and temperature relief valve, discharge tube to within 6" of floor, condensate pump, owners manual and all duct work to power vent to exterior. Provide separate electrical circuit and new gas piping from shut-off valve to fixture; de-energize outdated hazardous electrical wiring and components to bring wiring to current electrical code. Hazardous wiring may, but is not limited to, knob-and-tube and aluminum wiring. Disconnected knobs may remain installed. Removed items and materials to be properly disposed or recycled. See attached file.
Posted Date
Nov 14, 2025
Due Date
Dec 19, 2025
Release: Nov 14, 2025
Kent County
Close: Dec 19, 2025
Work includes electrical upgrade, water heater removal and replacement, and crawl space weatherization; install a 40 gallon, glass lined, minimum. 67 energy factor (ef), power vented, insulated to minimum r-16, gas fired water heater with a 6 year warranty. Include pressure and temperature relief valve, discharge tube to within 6" of floor, condensate pump, owners manual and all duct work to power vent to exterior. Provide separate electrical circuit and new gas piping from shut-off valve to fixture; de-energize outdated hazardous electrical wiring and components to bring wiring to current electrical code. Hazardous wiring may, but is not limited to, knob-and-tube and aluminum wiring. Disconnected knobs may remain installed. Removed items and materials to be properly disposed or recycled. See attached file.
AvailableKent County
Work includes residential roof/septic system replacement and chimney patch.
Posted Date
Nov 13, 2025
Due Date
Dec 3, 2025
Release: Nov 13, 2025
Kent County
Close: Dec 3, 2025
Work includes residential roof/septic system replacement and chimney patch.
AvailableNew York State Office of General Services
Work includes electrical upgrades & back up generator - electrical.
Posted Date
Nov 3, 2025
Due Date
Dec 3, 2025
Release: Nov 3, 2025
New York State Office of General Services
Close: Dec 3, 2025
Work includes electrical upgrades & back up generator - electrical.
AvailableSedalia School District 200
Electrical upgrades.
Posted Date
Nov 12, 2025
Due Date
Nov 20, 2025
Release: Nov 12, 2025
Sedalia School District 200
Close: Nov 20, 2025
Electrical upgrades.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis