Usmcfp Springfield
Replacement Sallyport "Stainless Steel" Grill Low Component.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Pickaway Correctional Institution
Troubleshoot, maintain and repair of vehicle sallyport gate.
Posted Date
Nov 12, 2025
Due Date
Nov 21, 2025
Release: Nov 12, 2025
Pickaway Correctional Institution
Close: Nov 21, 2025
Troubleshoot, maintain and repair of vehicle sallyport gate.
California Department of General Services
Major components of Project Work consist of temporary facilities, site clearing, earth moving, temporary erosion & sediment control, pavement marking removal, asbestos abatement, selective demolition, excavation, site utilities, subdrainage, concrete forming & accessories, cast-in-place concrete, asphalt paving, concrete paving, concrete paving for accessible routes, paving joint sealants, parking bumpers, pavement marking, tactile warning surfacing, high security chain link fencing, plant irrigation, landscape plants, metal fabrications, metal railings, penetration firestopping, folding doors, resilient flooring, room identification signage, parking signage, fire extinguishers, aluminum canopies, roller window shades, healthcare casework, fabricated metal buildings, plumbing piping, valves, plumbing hanger & supports, electric water heaters, water closets, lavatories, drinking fountains & water coolers, electrical raceway, low voltage conductors & cables, electrical hangers & supports, wiring, cable, wiring devices, panelboards, identification for electrical systems, lighting control devices, enclosed switches & circuit breakers, LED interior lighting, lighting poles & standards, LED exterior lighting, pathways for communication systems, communications backbone & horizontal cabling, inter communications & program systems, pathways for electronic safety & security, video surveillance, digital addressable fire alarm system, and related work.
Posted Date
Oct 30, 2025
Due Date
Dec 9, 2025
Release: Oct 30, 2025
California Department of General Services
Close: Dec 9, 2025
Major components of Project Work consist of temporary facilities, site clearing, earth moving, temporary erosion & sediment control, pavement marking removal, asbestos abatement, selective demolition, excavation, site utilities, subdrainage, concrete forming & accessories, cast-in-place concrete, asphalt paving, concrete paving, concrete paving for accessible routes, paving joint sealants, parking bumpers, pavement marking, tactile warning surfacing, high security chain link fencing, plant irrigation, landscape plants, metal fabrications, metal railings, penetration firestopping, folding doors, resilient flooring, room identification signage, parking signage, fire extinguishers, aluminum canopies, roller window shades, healthcare casework, fabricated metal buildings, plumbing piping, valves, plumbing hanger & supports, electric water heaters, water closets, lavatories, drinking fountains & water coolers, electrical raceway, low voltage conductors & cables, electrical hangers & supports, wiring, cable, wiring devices, panelboards, identification for electrical systems, lighting control devices, enclosed switches & circuit breakers, LED interior lighting, lighting poles & standards, LED exterior lighting, pathways for communication systems, communications backbone & horizontal cabling, inter communications & program systems, pathways for electronic safety & security, video surveillance, digital addressable fire alarm system, and related work.
AvailableU.S. Army Engineer District Tulsa
Replacing the low flow and wet well gates at Lake. Remove existing ladder in the north and south wet well. Remove and dispose existing low flow gate. Design, construct, and install new Low Flow Gate and appurtenances. Replacement gate for low flow gate must be fabricated from A709 structural steel. Gate design is to be in accordance with Engineering Manuals (EMs), Engineering Regulations (ERs) and Engineer Technical Letters (ETLs) as per USACE Criteria and Industry standards, and UFGS technical specifications. Constraint: Bridge crane cannot access the cylinder and bonnet of the low flow gate during the construction. The existing cylinder of the service gate next to it may have to be removed temporarily to provide access to the cylinder of the low flow gate. This will enable removal of the existing low flow gate and lowering the new low flow gate to the lower floor level where the gate cylinders are located. A portable crane may also be required to accomplish this task.
Posted Date
Nov 7, 2025
Due Date
Nov 24, 2025
Release: Nov 7, 2025
U.S. Army Engineer District Tulsa
Close: Nov 24, 2025
Replacing the low flow and wet well gates at Lake. Remove existing ladder in the north and south wet well. Remove and dispose existing low flow gate. Design, construct, and install new Low Flow Gate and appurtenances. Replacement gate for low flow gate must be fabricated from A709 structural steel. Gate design is to be in accordance with Engineering Manuals (EMs), Engineering Regulations (ERs) and Engineer Technical Letters (ETLs) as per USACE Criteria and Industry standards, and UFGS technical specifications. Constraint: Bridge crane cannot access the cylinder and bonnet of the low flow gate during the construction. The existing cylinder of the service gate next to it may have to be removed temporarily to provide access to the cylinder of the low flow gate. This will enable removal of the existing low flow gate and lowering the new low flow gate to the lower floor level where the gate cylinders are located. A portable crane may also be required to accomplish this task.
AvailableAllegheny Valley Railroad Company
Rail Replacement Project.
Posted Date
Nov 5, 2025
Due Date
Dec 9, 2025
Release: Nov 5, 2025
Allegheny Valley Railroad Company
Close: Dec 9, 2025
Rail Replacement Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis