Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide repairs of the existing siding, soffits and ornamental wood trim of the town hall and replacement of two exterior doors.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Design, fabricate, and install new exterior building signage to replace individually mounted, vacuum-formed plastic letters and numbers with a new signage system that reflects a more contemporary aesthetic, utilizes higher-quality and longer-lasting materials, and supports consistent application across multiple locations.
Posted Date
Dec 8, 2025
Due Date
Jan 22, 2026
Release: Dec 8, 2025
Close: Jan 22, 2026
Design, fabricate, and install new exterior building signage to replace individually mounted, vacuum-formed plastic letters and numbers with a new signage system that reflects a more contemporary aesthetic, utilizes higher-quality and longer-lasting materials, and supports consistent application across multiple locations.
Premium
Access the largest public sector contact database
Project includes remove existing stucco, foam and existing rock around exterior perimeter to expose exterior stud wall, remove all exterior windows and provide windows with installation of low e aluminum frame glass windows, remove all exterior doors and replace them with aluminum store front doors, provide material and install OSB around entire exterior wall, provide material and install exterior vapor barrier around exterior perimeter, provide material and install 3 (three) foot brick veneer around entire exterior perimeter, provide material and install transition cap for brick veneer to metal siding transition, install metal siding around exterior perimeter.
Posted Date
Nov 21, 2025
Due Date
Dec 20, 2025
Release: Nov 21, 2025
Close: Dec 20, 2025
Project includes remove existing stucco, foam and existing rock around exterior perimeter to expose exterior stud wall, remove all exterior windows and provide windows with installation of low e aluminum frame glass windows, remove all exterior doors and replace them with aluminum store front doors, provide material and install OSB around entire exterior wall, provide material and install exterior vapor barrier around exterior perimeter, provide material and install 3 (three) foot brick veneer around entire exterior perimeter, provide material and install transition cap for brick veneer to metal siding transition, install metal siding around exterior perimeter.
AvailableWork includes exterior repairs of a 31,330 SF apartment building in 2 levels including new roofing, replacement of windows and storefront with impact glazing, masonry repair and cleaning and painting; accessibility ramp.
Posted Date
Nov 25, 2025
Due Date
Dec 22, 2025
Release: Nov 25, 2025
Close: Dec 22, 2025
Work includes exterior repairs of a 31,330 SF apartment building in 2 levels including new roofing, replacement of windows and storefront with impact glazing, masonry repair and cleaning and painting; accessibility ramp.
AvailableRelease: Dec 11, 2025
Close: Jan 14, 2026
Clinic Exterior Renovations
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis