City of Hudson
Work consists of installation of approximately 4,200 LF of new five (5) foot wide class c concrete sidewalk, storm improvements, curbing, pedestrian improvements, driveway improvements, grading and restoration.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Ventura
The City of Ventura seeks proposals for the Residential Street Sidewalk and HAWK Signal Project, which involves closing sidewalk gaps, installing a HAWK signal, and adding curb ramps to improve connectivity and reduce traffic emissions. The project is federally funded and requires compliance with environmental and federal-aid procedures.
Posted Date
Nov 11, 2025
Due Date
Dec 18, 2025
Release: Nov 11, 2025
City of Ventura
Close: Dec 18, 2025
The City of Ventura seeks proposals for the Residential Street Sidewalk and HAWK Signal Project, which involves closing sidewalk gaps, installing a HAWK signal, and adding curb ramps to improve connectivity and reduce traffic emissions. The project is federally funded and requires compliance with environmental and federal-aid procedures.
AvailableCity of Missoula
All demolition, site work, and restoration; and more specifically includes installing 3140 LF of curb, 27,980 SF of concrete and sidewalk, and 1,130 SY of asphalt patch. Additionally, this project has a bid alternative that would include full re-paving of Street in the project area, which would include additional asphalt demolition and 10,514 SY of new asphalt.
Posted Date
Nov 7, 2025
Due Date
Nov 25, 2025
Release: Nov 7, 2025
City of Missoula
Close: Nov 25, 2025
All demolition, site work, and restoration; and more specifically includes installing 3140 LF of curb, 27,980 SF of concrete and sidewalk, and 1,130 SY of asphalt patch. Additionally, this project has a bid alternative that would include full re-paving of Street in the project area, which would include additional asphalt demolition and 10,514 SY of new asphalt.
AvailableCity of Ashland
The scope of work is replacement of sidewalk segments, curb segments, and other sidewalk components, including approx. 7,000 SF of curbwalk; 1,088 SF of 6" driveway entrance concrete; 28 SF of sidewalk, detectable warning pads, and all other necessary labor and materials as directed. See attached file.
Posted Date
Nov 10, 2025
Due Date
Nov 20, 2025
Release: Nov 10, 2025
City of Ashland
Close: Nov 20, 2025
The scope of work is replacement of sidewalk segments, curb segments, and other sidewalk components, including approx. 7,000 SF of curbwalk; 1,088 SF of 6" driveway entrance concrete; 28 SF of sidewalk, detectable warning pads, and all other necessary labor and materials as directed. See attached file.
AvailableCity of Fircrest
Improvement of approx. 700 LF of continuous traffic curb and gutter and sidewalk along the west side of Alameda Avenue between existing sidewalk end points at the Cypress Point driveway entrance, north to an existing curb ramp at the southwest corner of Emerson Street. Between the back of curb and sidewalk there will be a 5' wide planter area, consisting of 4' of landscaped area and 1' of choker course gravel. The sidewalk section will be installed as dense concrete over a ballast course that can accept surface runoff via the choker course and provide on-site infiltration. Existing driveways within the project limits will be replaced with dense concrete aprons and HMA driveway patches. Minor storm drain improvements within the roadway will be included as part of this project and all related work.
Posted Date
Nov 7, 2025
Due Date
Dec 2, 2025
Release: Nov 7, 2025
City of Fircrest
Close: Dec 2, 2025
Improvement of approx. 700 LF of continuous traffic curb and gutter and sidewalk along the west side of Alameda Avenue between existing sidewalk end points at the Cypress Point driveway entrance, north to an existing curb ramp at the southwest corner of Emerson Street. Between the back of curb and sidewalk there will be a 5' wide planter area, consisting of 4' of landscaped area and 1' of choker course gravel. The sidewalk section will be installed as dense concrete over a ballast course that can accept surface runoff via the choker course and provide on-site infiltration. Existing driveways within the project limits will be replaced with dense concrete aprons and HMA driveway patches. Minor storm drain improvements within the roadway will be included as part of this project and all related work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database