Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Indiana Department of Transportation
HMA overlay, preventive maintenance. Work includes 478 SY of scarification milling; 420 LF of joint adhesive; 1,010 SY of asphalt for tack coat; signage; pavement markings. See attached files.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Indiana Department of Transportation
HMA overlay, preventive maintenance. Work includes 79 Ton type C full depth HMA patching; 1,182 Ton type C partial depth HMA patching; 85,742 SY of 1 1/2" asphalt milling; pavement markings; signage. See attached files.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
HMA overlay, preventive maintenance. Work includes 79 Ton type C full depth HMA patching; 1,182 Ton type C partial depth HMA patching; 85,742 SY of 1 1/2" asphalt milling; pavement markings; signage. See attached files.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Indiana Department of Transportation
HMA overlay, preventive maintenance. Work includes 1 LS clearing right of way; 77 CY of common excavation; stormwater management; 1,728 Ton type C full depth HMA patching; 42,984 SY of 1 1/2" asphalt milling; 175,097 SY of 2" asphalt milling; 11,513 LF of 6'3" W-beam guardrail; 748 LF of video inspection for pipe; 406 LF of 42" cured-in-place pipe liner; pavement markings. See attached files for complete scope of work.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
HMA overlay, preventive maintenance. Work includes 1 LS clearing right of way; 77 CY of common excavation; stormwater management; 1,728 Ton type C full depth HMA patching; 42,984 SY of 1 1/2" asphalt milling; 175,097 SY of 2" asphalt milling; 11,513 LF of 6'3" W-beam guardrail; 748 LF of video inspection for pipe; 406 LF of 42" cured-in-place pipe liner; pavement markings. See attached files for complete scope of work.
AvailableIndiana Department of Transportation
HMA overlay, bridge deck overlay, signals and ADA ramps. Work includes 1 LS clearing right of way; 72 CY of common excavation; 3,091 Ton type D full depth HMA patching; 59,916 SY of 2" asphalt milling; 498 SY of concrete sidewalk; sodding; 64 LF of 8" dia sanitary sewer pipe; pavement markings; 1 Ea CCTV assembly. See attached files.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
HMA overlay, bridge deck overlay, signals and ADA ramps. Work includes 1 LS clearing right of way; 72 CY of common excavation; 3,091 Ton type D full depth HMA patching; 59,916 SY of 2" asphalt milling; 498 SY of concrete sidewalk; sodding; 64 LF of 8" dia sanitary sewer pipe; pavement markings; 1 Ea CCTV assembly. See attached files.
AvailableIndiana Department of Transportation
HMA overlay, small structure replace and bridge deck overlay. Work includes clearing right of way; 1,725 CY of common excavation; 5,617 LF of linear grading; 5,928 Ton type D full depth HMA patching; 263,708 SY of 1 1/2" asphalt milling; 220 LF of reset guardrail; 171 SY of erosion control blanket; 373 SY of sodding; 458 LF of video inspection for pipe; 1 Ea type C4 manhole; pavement markings. See attached files.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
HMA overlay, small structure replace and bridge deck overlay. Work includes clearing right of way; 1,725 CY of common excavation; 5,617 LF of linear grading; 5,928 Ton type D full depth HMA patching; 263,708 SY of 1 1/2" asphalt milling; 220 LF of reset guardrail; 171 SY of erosion control blanket; 373 SY of sodding; 458 LF of video inspection for pipe; 1 Ea type C4 manhole; pavement markings. See attached files.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →