Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Indiana Department of Transportation
HMA overlay, preventive maintenance. Work includes 79 Ton type C full depth HMA patching; 1,182 Ton type C partial depth HMA patching; 85,742 SY of 1 1/2" asphalt milling; pavement markings; signage. See attached files.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Indiana Department of Transportation
HMA overlay, preventive maintenance. Work includes 478 SY of scarification milling; 420 LF of joint adhesive; 1,010 SY of asphalt for tack coat; signage; pavement markings. See attached files.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
HMA overlay, preventive maintenance. Work includes 478 SY of scarification milling; 420 LF of joint adhesive; 1,010 SY of asphalt for tack coat; signage; pavement markings. See attached files.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Indiana Department of Transportation
HMA overlay, preventive maintenance. Work includes 1 LS clearing right of way; 77 CY of common excavation; stormwater management; 1,728 Ton type C full depth HMA patching; 42,984 SY of 1 1/2" asphalt milling; 175,097 SY of 2" asphalt milling; 11,513 LF of 6'3" W-beam guardrail; 748 LF of video inspection for pipe; 406 LF of 42" cured-in-place pipe liner; pavement markings. See attached files for complete scope of work.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
HMA overlay, preventive maintenance. Work includes 1 LS clearing right of way; 77 CY of common excavation; stormwater management; 1,728 Ton type C full depth HMA patching; 42,984 SY of 1 1/2" asphalt milling; 175,097 SY of 2" asphalt milling; 11,513 LF of 6'3" W-beam guardrail; 748 LF of video inspection for pipe; 406 LF of 42" cured-in-place pipe liner; pavement markings. See attached files for complete scope of work.
AvailableIndiana Department of Transportation
HMA overlay, bridge deck overlay, signals and ADA ramps. Work includes 1 LS clearing right of way; 72 CY of common excavation; 3,091 Ton type D full depth HMA patching; 59,916 SY of 2" asphalt milling; 498 SY of concrete sidewalk; sodding; 64 LF of 8" dia sanitary sewer pipe; pavement markings; 1 Ea CCTV assembly. See attached files.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
HMA overlay, bridge deck overlay, signals and ADA ramps. Work includes 1 LS clearing right of way; 72 CY of common excavation; 3,091 Ton type D full depth HMA patching; 59,916 SY of 2" asphalt milling; 498 SY of concrete sidewalk; sodding; 64 LF of 8" dia sanitary sewer pipe; pavement markings; 1 Ea CCTV assembly. See attached files.
AvailableIndiana Department of Transportation
HMA overlay, small structure replace and bridge deck overlay. Work includes clearing right of way; 1,725 CY of common excavation; 5,617 LF of linear grading; 5,928 Ton type D full depth HMA patching; 263,708 SY of 1 1/2" asphalt milling; 220 LF of reset guardrail; 171 SY of erosion control blanket; 373 SY of sodding; 458 LF of video inspection for pipe; 1 Ea type C4 manhole; pavement markings. See attached files.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
HMA overlay, small structure replace and bridge deck overlay. Work includes clearing right of way; 1,725 CY of common excavation; 5,617 LF of linear grading; 5,928 Ton type D full depth HMA patching; 263,708 SY of 1 1/2" asphalt milling; 220 LF of reset guardrail; 171 SY of erosion control blanket; 373 SY of sodding; 458 LF of video inspection for pipe; 1 Ea type C4 manhole; pavement markings. See attached files.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →