Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Fort Worth
The major work will consist of the (approximate) following paving, sidewalk, curb ramp, signing, and striping improvements for railroad crossing safety improvements. Also includes 75 LF of traffic signal cable (ty A) (14 AWG) (5 conductor); 24 SY of gravel; 30 LF of remove and replace existing fence; see attached files.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Fort Worth
City of Fort Worth invites bids for PW 2018 Bond Railroad Trinity Railway Express at Riverside Drive Safety Improvements, CPN 104004. The ITB covers paving, sidewalk, curb ramp, signing, and striping work to enhance safety at the Riverside Drive railroad crossing, with bids due January 8, 2026 at 2:00 PM CST.
Posted Date
Nov 12, 2025
Due Date
Jan 8, 2026
Release: Nov 12, 2025
City of Fort Worth
Close: Jan 8, 2026
City of Fort Worth invites bids for PW 2018 Bond Railroad Trinity Railway Express at Riverside Drive Safety Improvements, CPN 104004. The ITB covers paving, sidewalk, curb ramp, signing, and striping work to enhance safety at the Riverside Drive railroad crossing, with bids due January 8, 2026 at 2:00 PM CST.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Fort Worth
City of Fort Worth invites bids for PW 2018 Bond Railroad Trinity Railway Express at Riverside Drive Safety Improvements, CPN 104004. The ITB covers paving, sidewalk, curb ramp, signing, and striping work to enhance safety at the Riverside Drive railroad crossing, with bids due January 8, 2026 at 2:00 PM CST.
Posted Date
Nov 12, 2025
Due Date
Jan 8, 2026
Release: Nov 12, 2025
City of Fort Worth
Close: Jan 8, 2026
City of Fort Worth invites bids for PW 2018 Bond Railroad Trinity Railway Express at Riverside Drive Safety Improvements, CPN 104004. The ITB covers paving, sidewalk, curb ramp, signing, and striping work to enhance safety at the Riverside Drive railroad crossing, with bids due January 8, 2026 at 2:00 PM CST.
AvailableCity of Fort Worth
The major work will consist of the (approximate) following: pavement and traffic signal improvements at parkway and street intersection improvements. In addition, the project includes minor drainage, utility, illumination, pavement markings, and signage improvements. Also includes 1,200 CY of block sod placement; 4,386 SF of remove sidewalk; 4,731 SY of 10" concrete pavement; 70 LF of 12" DIP water (class 350), see attached files.
Posted Date
Oct 29, 2025
Due Date
Dec 4, 2025
Release: Oct 29, 2025
City of Fort Worth
Close: Dec 4, 2025
The major work will consist of the (approximate) following: pavement and traffic signal improvements at parkway and street intersection improvements. In addition, the project includes minor drainage, utility, illumination, pavement markings, and signage improvements. Also includes 1,200 CY of block sod placement; 4,386 SF of remove sidewalk; 4,731 SY of 10" concrete pavement; 70 LF of 12" DIP water (class 350), see attached files.
AvailableCity of Augusta
The work consists of the following: pedestrian safety improvements along water street with curb, drainage, and sidewalk improvements.
Posted Date
Nov 6, 2025
Due Date
Dec 5, 2025
Release: Nov 6, 2025
City of Augusta
Close: Dec 5, 2025
The work consists of the following: pedestrian safety improvements along water street with curb, drainage, and sidewalk improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →