Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Belton
This project involves construction of a wash bay building. This work includes pouring a concrete foundation, flooring, and walls, constructing wood walls, a metal catwalk, and bay doors.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Village of Elkhart Lake
Public works facility. The 15,091 SF facility will include a new drive-through shop/storage area for Village public works vehicles, for both parking and repair, a vehicle wash bay, office area for Public Works support staff and a mezzanine space for additional Public Works storage. The Work includes a complete exterior architectural precast wall panel system around the full building exterior. The roof system consists of steel bar joists, metal roof deck, rigid insulation and fully adhered EPDM roofing system. Also included are aluminum storefront entrances, windows and glazed clerestories. Interior partitions at the office area will be gypsum board on metal stud framing and CMU load bearing partitions for shop area storage rooms below an upper level mezzanine. Finishes to include Solvent based oil, water and stain repellent sealer with penetrating Silane at shop area and vinyl luxury tile and acoustical tile ceilings throughout the office area. Painting work to include all walls throughout the facility and including high performance coatings throughout the shop area. Mechanical systems, plumbing systems, electrical systems and sitework are part of the project.
Posted Date
Nov 7, 2025
Due Date
Dec 11, 2025
Release: Nov 7, 2025
Village of Elkhart Lake
Close: Dec 11, 2025
Public works facility. The 15,091 SF facility will include a new drive-through shop/storage area for Village public works vehicles, for both parking and repair, a vehicle wash bay, office area for Public Works support staff and a mezzanine space for additional Public Works storage. The Work includes a complete exterior architectural precast wall panel system around the full building exterior. The roof system consists of steel bar joists, metal roof deck, rigid insulation and fully adhered EPDM roofing system. Also included are aluminum storefront entrances, windows and glazed clerestories. Interior partitions at the office area will be gypsum board on metal stud framing and CMU load bearing partitions for shop area storage rooms below an upper level mezzanine. Finishes to include Solvent based oil, water and stain repellent sealer with penetrating Silane at shop area and vinyl luxury tile and acoustical tile ceilings throughout the office area. Painting work to include all walls throughout the facility and including high performance coatings throughout the shop area. Mechanical systems, plumbing systems, electrical systems and sitework are part of the project.
AvailableCity of Hudson
work consists of construction of the new Hudson Public Works facility and one Cold Storage structure, along with associated driveways, sidewalks, parking lot, fueling station, perimeter fencing, landscaping and associated earthwork, drainage and utilities
Posted Date
Nov 9, 2025
Due Date
Dec 4, 2025
Release: Nov 9, 2025
City of Hudson
Close: Dec 4, 2025
work consists of construction of the new Hudson Public Works facility and one Cold Storage structure, along with associated driveways, sidewalks, parking lot, fueling station, perimeter fencing, landscaping and associated earthwork, drainage and utilities
AvailableTown of Truro
Construction of a 11,145 SF department of public works building and attached 12,800 SF garage.
Posted Date
Oct 29, 2025
Due Date
Nov 20, 2025
Release: Oct 29, 2025
Town of Truro
Close: Nov 20, 2025
Construction of a 11,145 SF department of public works building and attached 12,800 SF garage.
AvailableTown of Milliken
DESIGN-BUILD proposed storage building will be constructed on town-owned property located just west of the existing Public Works Facility.
Posted Date
Oct 24, 2025
Due Date
Nov 24, 2025
Release: Oct 24, 2025
Town of Milliken
Close: Nov 24, 2025
DESIGN-BUILD proposed storage building will be constructed on town-owned property located just west of the existing Public Works Facility.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis