Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contractor shall provide labor, equipment, and materials to produce waterway sign panels (uniform waterway sign panels and private aids to navigation sign panels). vertical sign panel -flip Specifications: The 3’ x 4’ flip signs shall include 24” x 36” center flip panel; 5’ x 7’ flip sign shall include 42” x 60”center flip panel; 4’ x 6’ flip sign shall include 48” x 36” center flip panel. See attached file for full scope.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Contractor shall provide labor, equipment, and materials to produce waterway sign panels (uniform waterway sign panels and private aids to navigation sign panels). vertical sign panel -flip Specifications: The 3’ x 4’ flip signs shall include 24” x 36” center flip panel; 5’ x 7’ flip sign shall include 42” x 60”center flip panel; 4’ x 6’ flip sign shall include 48” x 36” center flip panel. See attached file for full scope.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Contractor shall provide labor, equipment, and materials to produce waterway sign panels (uniform waterway sign panels and private aids to navigation sign panels). vertical sign panel -flip Specifications: The 3’ x 4’ flip signs shall include 24” x 36” center flip panel; 5’ x 7’ flip sign shall include 42” x 60”center flip panel; 4’ x 6’ flip sign shall include 48” x 36” center flip panel. See attached file for full scope.
Available11 CY roadway excavation (type z-2) (aerially deposited lead); 61 ea plant (group b); 140 CY wood mulch; check and test existing irrigation facilities; 3 ea 1 1/2" remote control valve.
Posted Date
Nov 3, 2025
Due Date
Dec 18, 2025
Release: Nov 3, 2025
Close: Dec 18, 2025
11 CY roadway excavation (type z-2) (aerially deposited lead); 61 ea plant (group b); 140 CY wood mulch; check and test existing irrigation facilities; 3 ea 1 1/2" remote control valve.
AvailableSubstation panels for the central city substation.
Posted Date
Dec 2, 2025
Due Date
Dec 31, 2025
Release: Dec 2, 2025
Close: Dec 31, 2025
Substation panels for the central city substation.
AvailableRepair/repair and modify fuel management panels.
Posted Date
Sep 3, 2025
Due Date
Dec 18, 2025
Release: Sep 3, 2025
Close: Dec 18, 2025
Repair/repair and modify fuel management panels.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis