Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes a Well Chemical Building, 4,100 LF of 4" PVC WL and All Appurtenances. Also included are multiple valves and hydrants installed along existing water lines system wide. Additive Alternate 1 includes 1,350 LF of 4” PVC WL and All Appurtenances. Additive Alternate 2 includes a Master Meter Arrangement and All Appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
AvailablePremium
Access the largest public sector contact database
Construction of the Water Distribution System, Sanitary Sewer System, Streets, Water Quality and Drainage Improvements
Posted Date
Dec 11, 2025
Due Date
Jan 8, 2026
Release: Dec 11, 2025
Close: Jan 8, 2026
Construction of the Water Distribution System, Sanitary Sewer System, Streets, Water Quality and Drainage Improvements
AvailableWork include construction of new watermains, appurtenances, water service lines, meter vaults, installation of water meters, and installation of new water tank aeration system to improve and extend the town's existing water distribution system.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
Work include construction of new watermains, appurtenances, water service lines, meter vaults, installation of water meters, and installation of new water tank aeration system to improve and extend the town's existing water distribution system.
AvailableReplace the existing water distribution system, with polyvinyl chloride (PVC) and polyethylene (PE) water distribution system piping. Work includes, but is not limited to, installation of water mains, service lines, meter boxes, fire hydrants, valves and fittings: connecting to existing water distribution system; and completion of all associated site work.
Posted Date
Nov 7, 2025
Due Date
Jan 6, 2026
Release: Nov 7, 2025
Close: Jan 6, 2026
Replace the existing water distribution system, with polyvinyl chloride (PVC) and polyethylene (PE) water distribution system piping. Work includes, but is not limited to, installation of water mains, service lines, meter boxes, fire hydrants, valves and fittings: connecting to existing water distribution system; and completion of all associated site work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis