Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide 24/7 non-consensual wrecker services for vehicles with a gross vehicle weight of 10,000 pounds or less at DOA.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
The City of Atlanta is soliciting a contractor to replace approximately 55 aging network switches located in ceiling-mounted enclosures across airport concourses and the main terminal, requiring overnight work to minimize operational disruption. The scope includes removal of existing switches, installation of new switches, testing, daily progress reports, participation in status meetings, and final installation reports; work must adhere to safety regulations and coordinate with the onsite Network Operations Center engineer. The estimated project budget is $375,000$475,000 and the solicitation is posted as a Request for Proposal (not a grant).
Posted Date
-
Due Date
Jan 30, 2026
Close: Jan 30, 2026
The City of Atlanta is soliciting a contractor to replace approximately 55 aging network switches located in ceiling-mounted enclosures across airport concourses and the main terminal, requiring overnight work to minimize operational disruption. The scope includes removal of existing switches, installation of new switches, testing, daily progress reports, participation in status meetings, and final installation reports; work must adhere to safety regulations and coordinate with the onsite Network Operations Center engineer. The estimated project budget is $375,000$475,000 and the solicitation is posted as a Request for Proposal (not a grant).
AvailableOn Call Concrete.
Posted Date
Dec 5, 2025
Due Date
Dec 30, 2025
Release: Dec 5, 2025
Close: Dec 30, 2025
On Call Concrete.
AvailableOn Call Concrete.
Posted Date
Dec 5, 2025
Due Date
Dec 30, 2025
Release: Dec 5, 2025
Close: Dec 30, 2025
On Call Concrete.
AvailableThe California Department of Transportation (Caltrans) issued an Invitation for Bid (IFB) seeking contractors to provide on-call moving and modular systems furniture (MSF) services statewide, including assembly, disassembly, and transportation of furniture and IT equipment. Services will be performed on an as-needed basis across multiple counties and require specific licenses/permits (e.g., C61/D34 contractor license, Household Goods Carrier permit, forklift certification) and registration with the Department of Industrial Relations. The solicitation includes a mandatory pre-bid conference and is being procured via an IFB (not a grant); responses are due by the stated closing date.
Posted Date
Nov 20, 2025
Due Date
Dec 23, 2025
Release: Nov 20, 2025
Close: Dec 23, 2025
The California Department of Transportation (Caltrans) issued an Invitation for Bid (IFB) seeking contractors to provide on-call moving and modular systems furniture (MSF) services statewide, including assembly, disassembly, and transportation of furniture and IT equipment. Services will be performed on an as-needed basis across multiple counties and require specific licenses/permits (e.g., C61/D34 contractor license, Household Goods Carrier permit, forklift certification) and registration with the Department of Industrial Relations. The solicitation includes a mandatory pre-bid conference and is being procured via an IFB (not a grant); responses are due by the stated closing date.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis