Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of modifications to a pumping inlet structure on Prairie Creek, excavating to enlarge an existing wetland settling pond, installation of a viewing platform, and other associated work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
French Creek Elementary School Site Improvements Project.
Posted Date
Nov 17, 2025
Due Date
Jan 5, 2026
Release: Nov 17, 2025
Close: Jan 5, 2026
French Creek Elementary School Site Improvements Project.
AvailablePremium
Access the largest public sector contact database
Project is for a traditional breakpoint nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheetpile installation, tile installation, water control structure and seeding. This project includes about 18,700 cubic yards of earthwork, installation of 1,403 SF of steel sheetpile, water control structure, 385 LF of tile installation, 116 LF of drawdown pipe, 920 TN of riprap and clean stone, 115 cubic yards of concrete grout and 8.7 acres of seeding.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
Close: Dec 17, 2025
Project is for a traditional breakpoint nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheetpile installation, tile installation, water control structure and seeding. This project includes about 18,700 cubic yards of earthwork, installation of 1,403 SF of steel sheetpile, water control structure, 385 LF of tile installation, 116 LF of drawdown pipe, 920 TN of riprap and clean stone, 115 cubic yards of concrete grout and 8.7 acres of seeding.
AvailableThe project includes but is not limited to water main installation within County. The work includes approx. 11,300 LF of new 8" and 12" water main, together with all associated valves, hydrants, and connections to existing mains. The project also includes water services along each of these locations, including full length services from the public water main to within 5-FT of existing homes being serviced.
Posted Date
Nov 11, 2025
Due Date
Dec 15, 2025
Release: Nov 11, 2025
Close: Dec 15, 2025
The project includes but is not limited to water main installation within County. The work includes approx. 11,300 LF of new 8" and 12" water main, together with all associated valves, hydrants, and connections to existing mains. The project also includes water services along each of these locations, including full length services from the public water main to within 5-FT of existing homes being serviced.
AvailableWork includes sanitary sewer improvements project.
Posted Date
Nov 13, 2025
Due Date
Dec 22, 2025
Release: Nov 13, 2025
Close: Dec 22, 2025
Work includes sanitary sewer improvements project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis