Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Repair of an area maintenance support activity/equipment concentration site (amsa/ecs) vehicle maintenance facility.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The U.S. Army Corps of Engineers, Louisville District issued a Special Notice seeking comments from the construction community on the potential use of a Project Labor Agreement (PLA) for the planned repair of a 31,658 SF AMSA/ECS vehicle maintenance facility at the Arden Hills Army Reserve Center, MN. The estimated project value is $35–$40 million with an estimated contract duration of 900 calendar days; the Special Notice is a market survey only and explicitly states no proposals are being requested or accepted. Respondents are asked to provide comments and supporting documentation by e-mail to Adam.M.Brooks@usace.army.mil by 2:00 PM EST on December 16, 2025.
Posted Date
Dec 1, 2025
Due Date
Dec 16, 2025
Premium
Access the largest public sector contact database
Close: Dec 16, 2025
The U.S. Army Corps of Engineers, Louisville District issued a Special Notice seeking comments from the construction community on the potential use of a Project Labor Agreement (PLA) for the planned repair of a 31,658 SF AMSA/ECS vehicle maintenance facility at the Arden Hills Army Reserve Center, MN. The estimated project value is $35–$40 million with an estimated contract duration of 900 calendar days; the Special Notice is a market survey only and explicitly states no proposals are being requested or accepted. Respondents are asked to provide comments and supporting documentation by e-mail to Adam.M.Brooks@usace.army.mil by 2:00 PM EST on December 16, 2025.
AvailableProvide Repair AMSA / ECS. Repairing a failing, 31,658 SF Area Maintenance Support Activity/Equipment Concentration Site (AMSA/ECS) vehicle maintenance facility. Renovated Building(s) with a combined square footage of at least 20,000 SF on a single project of one or more building(s).
Posted Date
Dec 1, 2025
Due Date
Dec 16, 2025
Release: Dec 1, 2025
Close: Dec 16, 2025
Provide Repair AMSA / ECS. Repairing a failing, 31,658 SF Area Maintenance Support Activity/Equipment Concentration Site (AMSA/ECS) vehicle maintenance facility. Renovated Building(s) with a combined square footage of at least 20,000 SF on a single project of one or more building(s).
AvailableThe U.S. Army Corps of Engineers, Louisville District (USACE LRL) issued a Special Notice (PLA Market Survey) to solicit comments from the construction community on the potential use of a Project Labor Agreement (PLA) for a large-scale design-build modernization of Fort Hunter Liggett's potable water transmission and storage infrastructure. The project scope includes installing a new 5.25-mile 20-inch HDPE transmission line, two new storage tanks totaling 2.06 million gallons, a 4,500-foot access road, and upgrades to existing potable well facilities and ancillary systems. This is a market survey/sources-sought notice only (no proposals requested); interested parties should submit comments to Adam.M.Brooks@usace.army.mil by Dec 16, 2025, 2:00 PM EST.
Posted Date
Dec 1, 2025
Due Date
Dec 16, 2025
Release: Dec 1, 2025
Close: Dec 16, 2025
The U.S. Army Corps of Engineers, Louisville District (USACE LRL) issued a Special Notice (PLA Market Survey) to solicit comments from the construction community on the potential use of a Project Labor Agreement (PLA) for a large-scale design-build modernization of Fort Hunter Liggett's potable water transmission and storage infrastructure. The project scope includes installing a new 5.25-mile 20-inch HDPE transmission line, two new storage tanks totaling 2.06 million gallons, a 4,500-foot access road, and upgrades to existing potable well facilities and ancillary systems. This is a market survey/sources-sought notice only (no proposals requested); interested parties should submit comments to Adam.M.Brooks@usace.army.mil by Dec 16, 2025, 2:00 PM EST.
AvailableProject Labor Agreements (PLAs) for a large-scale construction project (exceeding $35 million) for the following: DESIGN BUILD project to Modernize the Potable Water Transmission and Storage Infrastructure by: Installation of a new dedicated 5.25 mile 20" transmission line of high-density polyethylene (HDPE) from potable water well field parallel to the existing failing 12" pipeline. The new transmission line will be installed adjacent to the gravel road, with required separation to prevent accidental damage to the existing potable water main during construction and future repairs. Installation of two new Storage Tanks (2.06 Mgal total capacity) along a ridge above FHL at an elevation of 1,250 FT (with provisions for future expansion). Construction of a 4,500 FT access road to access the new Storage Tank site. Upgrades to existing antiquated Potable Water Source Well facilities including ancillary equipment and building repairs including: chemical feed equipment, HVAC, life safety, security, SCADA-controls, and backup power systems.
Posted Date
Dec 1, 2025
Due Date
Dec 16, 2025
Release: Dec 1, 2025
Close: Dec 16, 2025
Project Labor Agreements (PLAs) for a large-scale construction project (exceeding $35 million) for the following: DESIGN BUILD project to Modernize the Potable Water Transmission and Storage Infrastructure by: Installation of a new dedicated 5.25 mile 20" transmission line of high-density polyethylene (HDPE) from potable water well field parallel to the existing failing 12" pipeline. The new transmission line will be installed adjacent to the gravel road, with required separation to prevent accidental damage to the existing potable water main during construction and future repairs. Installation of two new Storage Tanks (2.06 Mgal total capacity) along a ridge above FHL at an elevation of 1,250 FT (with provisions for future expansion). Construction of a 4,500 FT access road to access the new Storage Tank site. Upgrades to existing antiquated Potable Water Source Well facilities including ancillary equipment and building repairs including: chemical feed equipment, HVAC, life safety, security, SCADA-controls, and backup power systems.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis