Retrieving RFP details
Release
Close
City of Fort Gaines
Construction of new, mechanical wastewater treatment facility adjacent to the City's existing wastewater treatment plant and site improvements including grading, piping, and electrical improvements along with the installation of supervisory control and data acquisition (SCADA) at each of the City's existing lift stations.
202510_supportingdocs_PE-63050-NONST-2026-000000002-2025-10-03_11_53_50-e6f551c1-7e73-45cc-a73f-4c43150c193b
City of Huntington Beach
Work consists of replacement and modernization of the McFadden Sewer Lift Station (Station No. 21). The Work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, AC paving, and other appurtenant work.
City of Huntington Beach
The work consists of replacement and modernization of the sewer lift station. The work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, ac paving, and other appurtenant work.
Lake Stevens Sewer District
Work includes construct the lift station generator improvements. The scope of work for this project includes modifications to five small, separate lift stations within the sewer district service area. These lift stations are station 2, 3, 4, 5, and 6. Work at lift station 2 (schedule a) includes demolition of an existing generator building, construction of a new electrical stanchion, procurement and installation of a new diesel generator with subbase fuel tank and sound enclosure, site improvements, electrical modifications, and installation of a new, larger electrical service. Work at lift station 3 (schedule b) includes demolition of existing generator equipment, procurement and installation of a new diesel generator with custom subbase fuel tank, modifications to the existing cmu building, and electrical modifications. Work at lift station 4 (schedule c) Includes demolition of an existing generator building, construction of a new electrical stanchion, procurement and installation of a new diesel generator with subbase fuel tank and sound enclosure, site improvements, and electrical modifications. Work at lift station 5 (schedule d) includes demolition of an existing fuel tank and accompanying building, procurement and installation of a new diesel generator with subbase fuel tank, modifications to the existing concrete roof slab, site and concrete work, and electrical modifications.
City of Long Beach
Work consists of 1 LS Mobilization and Demobilization; 1 LS Lift Station 2 Improvements; 1 LS Lift Station 5 Improvements; 1 LS Breakers Lift Station Improvements; 10 CY Unsuitable Excavation; 1 LS Lift Station 2 Bypass Pumping; 1 LS Lift Station 5 Bypass Pumping; 1 LS Breakers Lift Station Bypass Pumping; 1 LS Lift Station 2 Electrical; 1 LS Lift Station 5 Electrical; 1 LS Breakers Lift Station Electrical.
Release
Oct 03, 2025
Close
Oct 29, 2025