Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes complete replacement of approximately 7,580 linear feet of inner and outer perimeter fencing, including line posts, fence fabric, razor ribbon, vehicular and pedestrian gates, and footings. The scope also includes realignment of portions of the interior zone fencing as needed, replacement of gates located within 30 F of the inner perimeter fence, and installation of new concrete walkways along the interior fence.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project includes complete replacement of approx. 15,000 LF of inner and outer perimeter fencing, including line posts, fence fabric, razor ribbon, vehicular and pedestrian gates, and footings. The scope also includes new concrete walkways along the interior fence and the replacement of gates located within 30 F of the inner perimeter fence.
Posted Date
May 9, 2025
Due Date
Dec 29, 2025
Release: May 9, 2025
Close: Dec 29, 2025
The project includes complete replacement of approx. 15,000 LF of inner and outer perimeter fencing, including line posts, fence fabric, razor ribbon, vehicular and pedestrian gates, and footings. The scope also includes new concrete walkways along the interior fence and the replacement of gates located within 30 F of the inner perimeter fence.
AvailableThe City of Chicago Department of Aviation is soliciting bids for the Perimeter Fence Replacement in the Southeast Airfield at O’Hare. The project includes design and construction of approximately 7,800 feet of Airport Operations Area fencing with a wildlife deterrent barrier and a 10-foot vegetative-free zone on either side of the realigned fence. This Small Business Initiative I construction procurement includes a pre-bid conference and responses are due February 11, 2026.
Posted Date
Dec 11, 2025
Due Date
Feb 11, 2026
Release: Dec 11, 2025
Close: Feb 11, 2026
The City of Chicago Department of Aviation is soliciting bids for the Perimeter Fence Replacement in the Southeast Airfield at O’Hare. The project includes design and construction of approximately 7,800 feet of Airport Operations Area fencing with a wildlife deterrent barrier and a 10-foot vegetative-free zone on either side of the realigned fence. This Small Business Initiative I construction procurement includes a pre-bid conference and responses are due February 11, 2026.
The City of Chicago Department of Aviation is soliciting bids for the Perimeter Fence Replacement in the Southeast Airfield at O’Hare. The project includes design and construction of approximately 7,800 feet of Airport Operations Area fencing with a wildlife deterrent barrier and a 10-foot vegetative-free zone on either side of the realigned fence. This Small Business Initiative I construction procurement includes a pre-bid conference and responses are due February 11, 2026.
Posted Date
Dec 11, 2025
Due Date
Feb 11, 2026
Release: Dec 11, 2025
Close: Feb 11, 2026
The City of Chicago Department of Aviation is soliciting bids for the Perimeter Fence Replacement in the Southeast Airfield at O’Hare. The project includes design and construction of approximately 7,800 feet of Airport Operations Area fencing with a wildlife deterrent barrier and a 10-foot vegetative-free zone on either side of the realigned fence. This Small Business Initiative I construction procurement includes a pre-bid conference and responses are due February 11, 2026.
Procurement of a perimeter fence.
Posted Date
Dec 11, 2025
Due Date
Feb 10, 2026
Release: Dec 11, 2025
Close: Feb 10, 2026
Procurement of a perimeter fence.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis