Retrieving RFP details
Release
Close
Lehigh Township Municipal (Water And Sewer) Authority
Wastewater Treatment Plant Phase 1. The Phase 1 construction of the treatment facility includes site work, piping and tanks installation, and stormwater management measures. The scope of Phase 1 does not include any mechanical equipment, structural buildings, or electrical work. The work to be completed encompasses the erosion and sedimentation controls, stormwater management facilities, site grading, landscaping, excavation, influent pump station wet well and valve vault, the influent screening chamber, the influent equalization tank, two (2) Sequencing Batch Reactor (SBR) tanks, post SBR equalization tank, yard piping, storm sewer, and gravity sanitary sewer from the Road Pump Station.
Pennsville Wastewater Treatment Plant Expansion Phase I
zip
City of Waco
Project generally consists of the expansion of the existing bull hide wastewater treatment facility to 4.0 mgd adf and 16.0 mgd p2hf, including construction of a new influent pump station, headworks to screen and degrit, flow distribution structure, process trains c and d, mixed liquor splitter box, secondary clarifiers c and d, disk filter, UV disinfection equipment (replace existing outdated equipment), solids storage and thickening facilities, odor control systems, alum feed facility, electrical and blower buildings/enclosures, and site civil piping, grading and drainage improvements.
City of Greenville
Provide 18 mgd wastewater treatment plant expansion - demolition contract.
Harris County Mud 495
Wastewater Treatment Plant No. 1 Phase 5 (1.50 MGD).
Release
Oct 06, 2025
Close
Oct 29, 2025