Retrieving RFP details
Release
Close
Harris County Mud 495
Wastewater Treatment Plant No. 1 Phase 5 (1.50 MGD).
0218-3074_Invitation to Bidders
City of Greenville
Provide 18 mgd wastewater treatment plant expansion - demolition contract.
Fort Bend County Mud 210
Project includes the construction of a 0.30 MGD prefabricated steel basin wastewater treatment plant. Includes all site work, including crushed concrete drive and foundations, asphalt driveway, storm sewer, swales, inlets, concrete pads, fencing, and all electrical controls, wiring, and conduit necessary for a complete system.
City of Waco
Project generally consists of the expansion of the existing bull hide wastewater treatment facility to 4.0 mgd adf and 16.0 mgd p2hf, including construction of a new influent pump station, headworks to screen and degrit, flow distribution structure, process trains c and d, mixed liquor splitter box, secondary clarifiers c and d, disk filter, UV disinfection equipment (replace existing outdated equipment), solids storage and thickening facilities, odor control systems, alum feed facility, electrical and blower buildings/enclosures, and site civil piping, grading and drainage improvements.
Release
Sep 17, 2025
Close
Oct 30, 2025