Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
State of New Hampshire DOT solicits bids for pavement resurfacing (8.7 miles, one section) across Ossipee, Effingham, and Freedom. Key response requirements: electronic bid submission via NH DOT portal, 5% bid bond, contractor prequalification and Department RFP form required for bidding authorization, and a 100% contract bond may be required for contracts $35,000 or greater.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 12,775 LF of removal of guardrail; 1,554 TN of crushed gravel for shoulder leveling; 606 TN of hbp-1/2" surface mix, machine method; 15,573 TN of hbp-3/8" surface mix, machine method, qc/qa tier 1; 115,315 TN of pavement joint adhesive; 17,910 TN of material transfer vehicle (mtv); 6,930 GAL of asphalt emulsion for tack coat; 1,731 TN of plant mix surface treatment, paver shim; 10,538 TN of cold planing bituminous surfaces; 1,165 LF of cold planing bituminous surfaces, 18" wide x 1" deep; 37 LF of asphaltic plug for crack control (f); etc, see attached file.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Work includes 12,775 LF of removal of guardrail; 1,554 TN of crushed gravel for shoulder leveling; 606 TN of hbp-1/2" surface mix, machine method; 15,573 TN of hbp-3/8" surface mix, machine method, qc/qa tier 1; 115,315 TN of pavement joint adhesive; 17,910 TN of material transfer vehicle (mtv); 6,930 GAL of asphalt emulsion for tack coat; 1,731 TN of plant mix surface treatment, paver shim; 10,538 TN of cold planing bituminous surfaces; 1,165 LF of cold planing bituminous surfaces, 18" wide x 1" deep; 37 LF of asphaltic plug for crack control (f); etc, see attached file.
AvailablePavement resurfacing & signal improvements.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
Pavement resurfacing & signal improvements.
AvailableRoad Resurfacing (Sealant/Pavement Restoration/Curbing).
Posted Date
Dec 1, 2025
Due Date
Jan 21, 2026
Release: Dec 1, 2025
Close: Jan 21, 2026
Road Resurfacing (Sealant/Pavement Restoration/Curbing).
AvailablePavement resurfacing and repairs highway and bridge maintenance division.
Posted Date
Nov 10, 2025
Due Date
Dec 12, 2025
Release: Nov 10, 2025
Close: Dec 12, 2025
Pavement resurfacing and repairs highway and bridge maintenance division.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis