Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Phase 2 includes site preparation, drainage under the pour in place, adding 270 linear feet of 8 x 8 concrete ring wall, 3600 square feet, 4-inch, 2500 psi concrete pad and adding 3600 square feet of surface america (playbound)�, flexground� or roberts recreations surfaces� brand pour in place. Pour in place may be of any color of the contractor s choice with lower cost colors being preferred. The pour in place surface should meet astm standards for specific playground surfacing � pouredin-place: astm 2479. Less than 2% grading will be required for the pour in place surfacing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Park renovations including playground equipment replacement and new rubberized safety surfacing, new park shelter, concrete flatwork and trail, site furnishings, landscaping and electrical. Add Alternate includes remodel of existing park restroom building.
Posted Date
Dec 11, 2025
Due Date
Jan 16, 2026
Release: Dec 11, 2025
Close: Jan 16, 2026
Park renovations including playground equipment replacement and new rubberized safety surfacing, new park shelter, concrete flatwork and trail, site furnishings, landscaping and electrical. Add Alternate includes remodel of existing park restroom building.
Premium
Access the largest public sector contact database
Outdoor recreation park additions improvements.
Posted Date
Nov 12, 2025
Due Date
Jan 5, 2026
Release: Nov 12, 2025
Close: Jan 5, 2026
Outdoor recreation park additions improvements.
AvailableDesert Shores Soccer Park Phase 2.
Posted Date
-
Due Date
Dec 22, 2025
Release: -
Close: Dec 22, 2025
Desert Shores Soccer Park Phase 2.
AvailableConstruction of the Acequia del Ancon Phase 2 Improvements Project. The project involves the construction of a new 36" diameter high-density polyethylene (HDPE) irrigation pipeline, a reinforced concrete access structure, dumped and hand-placed riprap, and miscellaneous improvements.
Posted Date
Dec 7, 2025
Due Date
Dec 16, 2025
Release: Dec 7, 2025
Close: Dec 16, 2025
Construction of the Acequia del Ancon Phase 2 Improvements Project. The project involves the construction of a new 36" diameter high-density polyethylene (HDPE) irrigation pipeline, a reinforced concrete access structure, dumped and hand-placed riprap, and miscellaneous improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis