Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Montgomery County
Work include rehabilitation and replacement of the existing stormwater lift station. Key improvements include the installation of a new wet well top slab and intermediate slab, as well as upgraded pumps, control systems, and electrical components.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Benton Harbor
Work include includes improvements to six existing lift stations and complete replacement of a seventh lift station. Improvements to six lift stations include items such as generator replacements, fencing, pump replacement, valve vault hatch replacement, driveway construction, plugging gravity sewer, electrical upgrades, and all associated removals. Crystal avenue lift station calls for partial removal and abandonment of the existing lift station and a proposed duplex submersible lift station, control panel, valves, piping, and all associated appurtenances.
Posted Date
Nov 11, 2025
Due Date
Dec 18, 2025
Release: Nov 11, 2025
City of Benton Harbor
Close: Dec 18, 2025
Work include includes improvements to six existing lift stations and complete replacement of a seventh lift station. Improvements to six lift stations include items such as generator replacements, fencing, pump replacement, valve vault hatch replacement, driveway construction, plugging gravity sewer, electrical upgrades, and all associated removals. Crystal avenue lift station calls for partial removal and abandonment of the existing lift station and a proposed duplex submersible lift station, control panel, valves, piping, and all associated appurtenances.
AvailableCity of Ormond Beach
Convert an existing wet pit/dry pit sewage lift station to a submersible lift station by removing all the block and frame construction, and a portion of the cast-in-place concrete construction; removing all equipment and material from within the generator room; the hvac equipment room; all piping material/equipment from within the dry pit pump area; all electrical equipment from within the electrical room; installing owner-supplied new submersible pumps in the wet well; site improvements and restoration.
Posted Date
Nov 9, 2025
Due Date
Dec 16, 2025
Release: Nov 9, 2025
City of Ormond Beach
Close: Dec 16, 2025
Convert an existing wet pit/dry pit sewage lift station to a submersible lift station by removing all the block and frame construction, and a portion of the cast-in-place concrete construction; removing all equipment and material from within the generator room; the hvac equipment room; all piping material/equipment from within the dry pit pump area; all electrical equipment from within the electrical room; installing owner-supplied new submersible pumps in the wet well; site improvements and restoration.
AvailableTown of Eatonville
The project consists of the demolition of the existing lift station facilities and construction of a new duplex pump station, above ground valve assembly, electrical instrumentation and controls system, generator pad with diesel generator, 8-inch diameter gravity sewer, 4-inch PVC force main, one (1) gravity sewer doghouse manhole, lining of existing gravity sewer manhole and concrete flume
Posted Date
Oct 27, 2025
Due Date
Dec 4, 2025
Release: Oct 27, 2025
Town of Eatonville
Close: Dec 4, 2025
The project consists of the demolition of the existing lift station facilities and construction of a new duplex pump station, above ground valve assembly, electrical instrumentation and controls system, generator pad with diesel generator, 8-inch diameter gravity sewer, 4-inch PVC force main, one (1) gravity sewer doghouse manhole, lining of existing gravity sewer manhole and concrete flume
AvailableStanley Lake Mud
Rehabilitation of duplex submersible pump lift station including replacement of piping and valves, appurtenances and electrical equipment.
Posted Date
Nov 11, 2025
Due Date
Dec 4, 2025
Release: Nov 11, 2025
Stanley Lake Mud
Close: Dec 4, 2025
Rehabilitation of duplex submersible pump lift station including replacement of piping and valves, appurtenances and electrical equipment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis