Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consist of approx 17,697 FT remove fence; 5,202 SY remove asphalt concrete pavement; 108,851 CY unclassified excavation; 1,089 CY bridge structure excavation; 2,322 CY bridge end embankment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 48 LF sawing bituminous pavement (full depth); 1,758 CY excavation - common (p); 1 LS dewatering; 71 CY aggregate surfacing (cv) class 5 (p); 554 cy aggregate base (cv) class 5 (p); 54 LF 12x8 precast concrete box culvert; 34 LF 12" cas pipe culvert; 32 CY random riprap class iii; 1 LS erosion control supervisor; 120 LF interim pavement marking; 120 LF 4" broken line paint.
Posted Date
Dec 12, 2025
Due Date
Jan 8, 2026
Release: Dec 12, 2025
Close: Jan 8, 2026
Work includes 48 LF sawing bituminous pavement (full depth); 1,758 CY excavation - common (p); 1 LS dewatering; 71 CY aggregate surfacing (cv) class 5 (p); 554 cy aggregate base (cv) class 5 (p); 54 LF 12x8 precast concrete box culvert; 34 LF 12" cas pipe culvert; 32 CY random riprap class iii; 1 LS erosion control supervisor; 120 LF interim pavement marking; 120 LF 4" broken line paint.
Premium
Access the largest public sector contact database
Grading, bituminous surfacing, concrete surfacing, signals, and ADA improvements.
Posted Date
Nov 20, 2025
Due Date
Dec 22, 2025
Release: Nov 20, 2025
Close: Dec 22, 2025
Grading, bituminous surfacing, concrete surfacing, signals, and ADA improvements.
AvailableWork includes 2,608 CY excavation - common (p); 73 CY aggregate surfacing (cv) class 6; 68 GAL bituminous material for tack coat; 9 LF construct drainage structure design n; 7 LF construct drainage structure design 48-4020; 27 CY random riprap class ii; 560 SF 6" concrete walk; 790 SF 7" concrete walk special; 258 SF concrete curb ramp walk; 1 LS lighting system; 622 SF sign; 1. 10 acre seeding; 560 LF 6" broken line multi-component ground in (wr); 270 SF pavement message preform thermoplastic ground in.
Posted Date
Dec 12, 2025
Due Date
Jan 8, 2026
Release: Dec 12, 2025
Close: Jan 8, 2026
Work includes 2,608 CY excavation - common (p); 73 CY aggregate surfacing (cv) class 6; 68 GAL bituminous material for tack coat; 9 LF construct drainage structure design n; 7 LF construct drainage structure design 48-4020; 27 CY random riprap class ii; 560 SF 6" concrete walk; 790 SF 7" concrete walk special; 258 SF concrete curb ramp walk; 1 LS lighting system; 622 SF sign; 1. 10 acre seeding; 560 LF 6" broken line multi-component ground in (wr); 270 SF pavement message preform thermoplastic ground in.
AvailableReplace culverts, cold plane AC pavement and overlay with HMA.
Posted Date
Oct 6, 2025
Due Date
Dec 18, 2025
Release: Oct 6, 2025
Close: Dec 18, 2025
Replace culverts, cold plane AC pavement and overlay with HMA.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis