Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Cincinnati
The City of Cincinnati, on behalf of the Metropolitan Sewer District of Greater Cincinnati (MSDGC), seeks an Owner's Advisor to provide planning, design, and construction-phase technical and project management support for the Mill Creek Wastewater Treatment Plant Dewatering Building Improvements project. Services include business case evaluation, development of design-builder procurement documents, contract negotiation assistance, and ensuring compliance with MSDGC small business and regulatory requirements.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
East Bay Municipal Utility District
East Bay Municipal Utility District seeks professional engineering consultant services for an Owner Advisor role in the Dewatering Improvements Project at its Main Wastewater Treatment Plant. The project will use a progressive design-build method, requiring expertise in guiding the District through this process, ensuring project completion on schedule and within budget.
Posted Date
Nov 6, 2025
Due Date
Dec 19, 2025
Release: Nov 6, 2025
East Bay Municipal Utility District
Close: Dec 19, 2025
East Bay Municipal Utility District seeks professional engineering consultant services for an Owner Advisor role in the Dewatering Improvements Project at its Main Wastewater Treatment Plant. The project will use a progressive design-build method, requiring expertise in guiding the District through this process, ensuring project completion on schedule and within budget.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Seattle
Underground cable replacement project- owner advisor.
Posted Date
Oct 20, 2025
Due Date
Nov 24, 2025
Release: Oct 20, 2025
City of Seattle
Close: Nov 24, 2025
Underground cable replacement project- owner advisor.
AvailableBrookings Municipal Utilities
Modifications in existing digester building. - removal/demolition of existing dewatering screw press, polymer blending feed system, pumps, process piping and electrical. Installation of new dewatering screw press feed pump, process piping and valves and electrical. New dewatering building. Concrete and masonry. Roofing membrane system. HVAC, ductwork and other mechanical items. Plumbing systems. Installation of two dewatering screw presses (one new, one existing), two polymer blending systems (one new, one existing), dewatered sludge conveyor belt and conveyor maintenance platform/stairs and process piping and valves. Monorails with hoists. Maintenance platform. Electrical and controls. New biosolids storage bunker. Concrete work for structure. Civil site. Earthwork and site grading. Groundwater dewatering. Site underground process, sanitary and water piping. Site paving, sidewalks, driveways.
Posted Date
Oct 31, 2025
Due Date
Dec 4, 2025
Release: Oct 31, 2025
Brookings Municipal Utilities
Close: Dec 4, 2025
Modifications in existing digester building. - removal/demolition of existing dewatering screw press, polymer blending feed system, pumps, process piping and electrical. Installation of new dewatering screw press feed pump, process piping and valves and electrical. New dewatering building. Concrete and masonry. Roofing membrane system. HVAC, ductwork and other mechanical items. Plumbing systems. Installation of two dewatering screw presses (one new, one existing), two polymer blending systems (one new, one existing), dewatered sludge conveyor belt and conveyor maintenance platform/stairs and process piping and valves. Monorails with hoists. Maintenance platform. Electrical and controls. New biosolids storage bunker. Concrete work for structure. Civil site. Earthwork and site grading. Groundwater dewatering. Site underground process, sanitary and water piping. Site paving, sidewalks, driveways.
AvailablePasco County
DESIGN-BUILD. A third party engineer or consultant to facilitate, collaborate, oversee and provide an advisory role for county design build project
Posted Date
Oct 16, 2025
Due Date
Nov 25, 2025
Release: Oct 16, 2025
Pasco County
Close: Nov 25, 2025
DESIGN-BUILD. A third party engineer or consultant to facilitate, collaborate, oversee and provide an advisory role for county design build project
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →