Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Owensville
Work includes wastewater collection system rehabilitation: base project and alternatives consist of the construction of approx. 5,700 LF of PVC sanitary sewer pipe, installation of precast concrete manholes and all necessary appurtenances.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Canadian
Wastewater collection system and treatment improvements including a comprehensive evaluation of the treatment processes and the collection system.
Posted Date
Nov 12, 2025
Due Date
Dec 1, 2025
Release: Nov 12, 2025
Town of Canadian
Close: Dec 1, 2025
Wastewater collection system and treatment improvements including a comprehensive evaluation of the treatment processes and the collection system.
AvailableTown of Maury City
Wastewater Collection System Improvements, Replace Pumping Station ″A″, 2023 Community Development Block Grant.
Posted Date
Jun 27, 2025
Due Date
Dec 9, 2025
Release: Jun 27, 2025
Town of Maury City
Close: Dec 9, 2025
Wastewater Collection System Improvements, Replace Pumping Station ″A″, 2023 Community Development Block Grant.
AvailableSt. John the Baptist Parish
Provide wastewater treatment plant aeration basin rehabilitation and grit system replacement. The aeration basin air system requires a full rehabilitation. The scope of work includes: dewatering, removing and disposing the accumulated sludge, and cleaning all four cells of the aeration basin; complete replacement of all air distribution system in all four cells of the aeration basin. Once initial cleaning is complete, all remaining metal piping, fittings, and valves from the blowers to the new joints on the drop pipes in the aeration basin will be blast-cleaned and repainted. Due to the current inaccessibility of the filled cells, additional repairs to pedestals, tank walls, and floors may be required. See attached file.
Posted Date
Nov 19, 2025
Due Date
Dec 19, 2025
Release: Nov 19, 2025
St. John the Baptist Parish
Close: Dec 19, 2025
Provide wastewater treatment plant aeration basin rehabilitation and grit system replacement. The aeration basin air system requires a full rehabilitation. The scope of work includes: dewatering, removing and disposing the accumulated sludge, and cleaning all four cells of the aeration basin; complete replacement of all air distribution system in all four cells of the aeration basin. Once initial cleaning is complete, all remaining metal piping, fittings, and valves from the blowers to the new joints on the drop pipes in the aeration basin will be blast-cleaned and repainted. Due to the current inaccessibility of the filled cells, additional repairs to pedestals, tank walls, and floors may be required. See attached file.
AvailableCity of Ogdensburg
Wastewater pump station rehabilitation - electrical construction.
Posted Date
Oct 30, 2025
Due Date
Dec 2, 2025
Release: Oct 30, 2025
City of Ogdensburg
Close: Dec 2, 2025
Wastewater pump station rehabilitation - electrical construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis