Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The San Antonio Water System (SAWS) issued an Invitation for Bid for a one-time purchase and delivery of fiberglass reinforced plastic (FRP) scum baffles, supports, and brackets as exact replacements for primary clarifier #4 at the Steven M. Clouse Water Recycling Center. Questions are due by December 10, 2025 at 3:00 PM CT and bids close on December 15, 2025 at 3:00 PM CT; documents and submission instructions are posted on the SAWS IonWave portal. The procurement requires electronic or sealed bid submission and includes standard attachments (general requirements/scope, insurance specs, terms and conditions, security procedures, CIQ and No-Bid sheet) available on the SAWS bid site (login required).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
One Time Purchase of Clarifier Inner Baffle FRP Supports and Plates for the Steven M. Clouse Water Recycling Center (SMCWRC).
Posted Date
Dec 8, 2025
Due Date
Dec 15, 2025
Release: Dec 8, 2025
Close: Dec 15, 2025
One Time Purchase of Clarifier Inner Baffle FRP Supports and Plates for the Steven M. Clouse Water Recycling Center (SMCWRC).
AvailableProvide fabrication of a steel pedestrian bridge and deflector plate improvements. Remove and salvage the existing wood framed pedestrian bridge. Proposer shall provide all rigging, equipment, and personnel to safely remove the existing wooden pedestrian bridge and store. Fabricate and install a new galvanized steel pedestrian bridge, including beams, embedded anchors, c-channel supports, protective plates, and a 1-1/2 inch galvanized steel i-bar grating. Fabricate and install new 1-1/2 inch diameter galvanized steel post and pipe railing on each side of the bridge and extended from the existing rails. The openings between the new railings and the existing railings shall be closed using rail and post extensions.
Posted Date
Dec 5, 2025
Due Date
Jan 7, 2026
Release: Dec 5, 2025
Close: Jan 7, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide fabrication of a steel pedestrian bridge and deflector plate improvements. Remove and salvage the existing wood framed pedestrian bridge. Proposer shall provide all rigging, equipment, and personnel to safely remove the existing wooden pedestrian bridge and store. Fabricate and install a new galvanized steel pedestrian bridge, including beams, embedded anchors, c-channel supports, protective plates, and a 1-1/2 inch galvanized steel i-bar grating. Fabricate and install new 1-1/2 inch diameter galvanized steel post and pipe railing on each side of the bridge and extended from the existing rails. The openings between the new railings and the existing railings shall be closed using rail and post extensions.